![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
Made Easy Tool for DEFINITY Media Server Configurations
Issue 5, October 2002
Install Additional Hardware
Power Up System (Packet Bus Support)
- At the EPN, set the main circuit breaker to ON.
- At the PPN, set the main circuit breaker to ON.
- The system performs a level 4 reboot, loading the system translations from the translation cards. Rebooting takes about 10 minutes.
- After all trouble is cleared, verify the EMERGENCY TRANSFER CONTROL switch is set to AUTO. This restores the system to the normal mode.
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
Copyright� 2002 Avaya Inc. |
Send comments to MadeEasy Development Team |
Always check at the Made Easy Web site for the most current information. |