Yes, that's the plan.

Forgive me here, this is going to sound really basic.

We had 3 POTS line that are being ported as well. Do those need to go to the ports I mentioned earlier,

"also there is an RJ11 in port 7/8 on the top of the IP500 going to one punch block in my switch room, and top and bottom on 5/6 goes to another punch box. we have 3 POTS lines, there are no lights on any of those ports, I assume I need to get wires to the new punches for the 3 POTS lines, which are being ported to Nuvox/Windstream as well."

I came onsite well after all the phone equipment was installed, and both punch blocks look like nightmares. I guess I will likely end up having to tone everything out..