![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
DEFINITY Made Easy Tools
Issue 2, November 2000
Bring the System Online
Note: | If the system is high or critical reliability, power-up the Expansion Port Network (EPN) first, then the Processor Port Network (PPN). Always power up the control cabinet last. |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
Copyright� 2000 Avaya Inc |
Send comments to MadeEasy Development Team |
Always check at the Made Easy Web site for the most current information. |