DEFINITY Made Easy Home Page Table of contents Previous page Next page Index Links Frequently asked questions
Go to Upgrades for R9 Go to Installation for MCC Go to Installation for SCC



Enable Duplication and Boot Critical Reliability System (Release 8r)

Return to Task List

  1. Type change system-parameters duplication and press Enter.

  2. Make sure duplication of both SPE and PNC are enabled on the screen that follows the command. Confirm that a y is contained in both fields.

  3. Type save translation and press Enter.

  4. Type reset system 4 and press Enter to reboot the system.

  5. Log in as craft .

  6. About 8 minutes after booting the system, type status spe and press Enter.

  7. Verify that handshake, shadowing, and refreshed are all shown to be either yes or on.

Return to Task List


DEFINITY Made Easy Home Page Table of contents Previous page Next page Index Links Frequently asked questions
Go to Upgrades for R9 Go to Installation for MCC Go to Installation for SCC
Copyright 2000 Avaya Inc
Send comments to MadeEasy Development Team



Always check at the Made Easy Web site for the most current information.