DEFINITY Made Easy Home Page Table of contents Previous page Next page Index Links Frequently asked questions
Go to Upgrades for R9 Go to Installation for MCC Go to Installation for SCC



Position the EPN Cabinets

Return to Task List

Each EPN cabinet is normally positioned adjacent to the PPN cabinet but may be located remotely in a different room or a different building.

  1. The procedure for installing an EPN cabinet is the same as for the PPN cabinet.

  2. If earthquake protection is required, Install Earthquake Protection for MCC.

  3. If earthquake protection is not required, level the cabinets and adjust and lock the cabinet stabilizing bolts to keep the cabinets from moving.


Note: To install a new EPN cabinet to an existing system, refer to DEFINTY Enterprise Communications Server Release 8 Upgrades and Additions for R8r.

Return to Task List


DEFINITY Made Easy Home Page Table of contents Previous page Next page Index Links Frequently asked questions
Go to Upgrades for R9 Go to Installation for MCC Go to Installation for SCC
Copyright 2000 Avaya Inc
Send comments to MadeEasy Development Team



Always check at the Made Easy Web site for the most current information.