DEFINITY Made Easy Home Page Table of contents Previous page Next page Index Links Frequently asked questions
Go to Upgrades for si Go to Installation for MCC Go to Installation for SCC



Position the EPN Cabinets

Return to Task List

Each EPN cabinet is normally positioned adjacent to the PPN cabinet but may be located remotely in a different room or a different building. A configuration can have up to 5 EPNs in a MCC1.

  1. The procedure for installing an EPN cabinet is the same as for the PPN cabinet.

  2. If earthquake protection is required, Install Earthquake Protection for MCC1.

  3. If earthquake protection is not required, level the cabinets and adjust and lock the cabinet stabilizing bolts to keep the cabinets from moving.


Note: To install a new EPN cabinet to an existing system, refer to the Upgrades and Additions for Avaya DEFINITY® Server R.

Return to Task List


DEFINITY Made Easy Home Page Table of contents Previous page Next page Index Links Frequently asked questions
Go to Upgrades for si Go to Installation for MCC Go to Installation for SCC
Copyright 2002 Avaya Inc.
Send comments to MadeEasy Development Team



Always check at the Made Easy Web site for the most current information.