Made Easy Tool for DEFINITY Media Server Configurations
Issue 4, May 2002
System 75 XE to R8si (Blowback)
Verify power and grounding and check for power transfer stations [75 XE upgrade]
- Verify the power and grounding and make any changes, if necessary.
- Insert an isolator, if necessary.
- Visually inspect for power transfer panels.
| Copyright� 2002 Avaya Inc. |
| Send comments to MadeEasy Development Team |
| Always check at the Made Easy Web site for the most current information. |