CM 7.0 Upgrade

Collapse
X
 
  • Filter
  • Time
  • Show
Clear All
new posts

  • mlombardi1
    replied
    Originally posted by aleks43 View Post
    Communication manager version 6.3.0.141 is deployed on platform systems. I need to upgrade to version 7.1.3. But if I make a full backup and try to restore it, then in ACA I get all the fields empty. Tell me what could be the error.
    After restoring the CM backup, execute "reset sys 4". Translations are loaded into running memory upon software reset.

    Leave a comment:


  • aleks43
    replied
    upgrade from 6.3 to 7.0

    Hi all
    I have avaya media gateway s8300d. And system platform 6.3.7.0.
    Communication manager version 6.3.0.141 is deployed on platform systems. I need to upgrade to version 7.1.3.
    But if I make a full backup and try to restore it, then in ACA I get all the fields empty. Tell me what could be the error.

    Leave a comment:


  • hurdk
    replied
    You cannot load WEBLM on the 8300 for AVP. Avaya forces you to use system manager.....

    Leave a comment:


  • mlombardi1
    replied
    Originally posted by rfavire View Post
    Anyone successfully load an S8300D...? I tried to load CM OVA, CMM OVA, Utility Server Ova (Services port only) and when I tried to load WebLM OVA it failed do to size capacity. Any suggestions would be appreciated.
    I don't think the WebLM OVA is meant for the S8300. System Manager is a mandatory component for Aura 7 and should be used as the licensing repository. SMGR resides on a full-size AVP hypervisor server platform or customer VMware.

    Originally posted by canue View Post
    Can the upgrade be done remotely? We were loading up the iso to /vsp-template then creating a vsp-sup/ folder and mounting it from there. Will that still be valid?
    What are the versions involved? Upgrades from 6.0.x to 6.3.x on System Platform can indeed be accomplished remotely by mounting the ISOs as you describe. Avaya recently announced support for 5.2.1 and later upgrading to 7.1.x remotely using SDM.

    Leave a comment:


  • canue
    replied
    Can the upgrade be done remotely? We were loading up the iso to /vsp-template then creating a vsp-sup/ folder and mounting it from there. Will that still be valid?

    Leave a comment:


  • rfavire
    replied
    Anyone successfully load an S8300D...? I tried to load CM OVA, CMM OVA, Utility Server Ova (Services port only) and when I tried to load WebLM OVA it failed do to size capacity. Any suggestions would be appreciated.
    Last edited by rfavire; 02-13-2017, 08:49 AM.

    Leave a comment:


  • aa1
    replied
    PSN # PSN020272u CM upgrade path

    Worth checking for other releases (PSN # PSN020272u - CM upgrade paths - Avaya Aura® Communication Manager (CM), Releases 2.0 – 7.x)




    Arbi

    Leave a comment:


  • aa1
    replied
    Migrating from Communication Manager Release 5.2.1 to Release 7.0 and later

    Please take a look at this document

    Upgrading Avaya Aura® Communication Manager (Release 7.0.1 Issue 3.1 October 2016)
    Migrating from Communication Manager Release 5.2.1 to Release 7.0 and later
    Page 114


    Procedure
    1. Back up data from the Communication Manager 5.2.1 System Management Interface page.
    2. Deploy the Communication Manager 7.0 OVA.
    3. Restore the data on the Communication Manager 7.0 server.
    4. Restart the Communication Manager 7.0 server.
    5. Install the Communication Manager 7.0 authentication file.
    6. Apply the Communication Manager patch for 7.0.1.

    Leave a comment:


  • rfavire
    replied
    How about the upgrade path from Release 5 to Release 7 using a new S8300E server and replacing an S8300C...thanks

    Originally posted by aa1 View Post
    In Release 7.0, Appliance Virtualization Platform replaces System Platform. Avaya Aura® Release 7.0 supports the following applications on Appliance Virtualization Platform:
    - Utility Services 7.0
    - System Manager 7.0
    - Session Manager 7.0
    - Branch Session Manager 7.0
    - Communication Manager 7.0
    - Application Enablement Services 7.0
    - WebLM 7.0
    - Engagement Development Platform 3.1
    - SAL 2.5
    - Communication Manager Messaging 7.0
    - Avaya Aura® Media Server 7.7


    Supported servers •
    - S8300D
    - S8300E
    - Dell™ PowerEdge™ R610
    - HP ProLiant DL360 G7
    - Dell™ PowerEdge™ R620
    - Dell™ PowerEdge™ R620


    More info: https://downloads.avaya.com/css/P8/documents/101014461 (Chapter 6: Migration process)


    https://downloads.avaya.com/css/P8/documents/101014262 (Page 21)
    Supported upgrade paths to Avaya Aura® Release 7.0
    Release: 6.3.x, 6.2.x, 6.1.x, or 6.0 Service Pack 1 and 2
    Offer and Deployment: System Platform

    Avaya-provided Virtual Appliance
    1. Create a backup of 6.x.
    2. Install Appliance Virtualization Platform.
    3. Deploy Release 7.0 with Solution Deployment Manager client.
    4. Restore the data with data migration utility by using System Manager command line interface or Solution Deployment Manager client

    Customer-provided VMware
    1. Create a backup of 6.x with latest System Platform.
    2. Deploy Release 7.0 on the customersupplied server or VMware infrastructure with Solution Deployment Manager or vCenter.
    3. Restore the data with data migration utility by using System Manager command line interface or Solution Deployment Manager client

    ...


    Upgrades from System Platform on 6.x to Appliance Virtualization Platform on Avaya Aura® Release 7.0
    In Release 7.0, you can select the applications that are installed on a server. Therefore, when planning for upgrade to Release 7.0, you must ensure that correct application OVA files are included. (more on this on page 33)


    Hope these help
    Arbi

    Leave a comment:


  • danweber
    replied
    Anyone know if I can re-use some of my Dell R610 servers that were originally hosting AES 6.x for CM version 7? I have 5 AES servers on Dell R610s that I am retiring, would be great if I could use that hardware to replace the CM servers I have running on 8800s.

    Leave a comment:


  • cef2lion
    replied
    Very useful!! Thank you very much. Clears it up for me.

    Craig

    Leave a comment:


  • aa1
    replied
    CM 7.0 Upgrade

    In Release 7.0, Appliance Virtualization Platform replaces System Platform. Avaya Aura® Release 7.0 supports the following applications on Appliance Virtualization Platform:
    - Utility Services 7.0
    - System Manager 7.0
    - Session Manager 7.0
    - Branch Session Manager 7.0
    - Communication Manager 7.0
    - Application Enablement Services 7.0
    - WebLM 7.0
    - Engagement Development Platform 3.1
    - SAL 2.5
    - Communication Manager Messaging 7.0
    - Avaya Aura® Media Server 7.7


    Supported servers •
    - S8300D
    - S8300E
    - Dell™ PowerEdge™ R610
    - HP ProLiant DL360 G7
    - Dell™ PowerEdge™ R620
    - Dell™ PowerEdge™ R620


    More info: https://downloads.avaya.com/css/P8/documents/101014461 (Chapter 6: Migration process)


    https://downloads.avaya.com/css/P8/documents/101014262 (Page 21)
    Supported upgrade paths to Avaya Aura® Release 7.0
    Release: 6.3.x, 6.2.x, 6.1.x, or 6.0 Service Pack 1 and 2
    Offer and Deployment: System Platform

    Avaya-provided Virtual Appliance
    1. Create a backup of 6.x.
    2. Install Appliance Virtualization Platform.
    3. Deploy Release 7.0 with Solution Deployment Manager client.
    4. Restore the data with data migration utility by using System Manager command line interface or Solution Deployment Manager client

    Customer-provided VMware
    1. Create a backup of 6.x with latest System Platform.
    2. Deploy Release 7.0 on the customersupplied server or VMware infrastructure with Solution Deployment Manager or vCenter.
    3. Restore the data with data migration utility by using System Manager command line interface or Solution Deployment Manager client

    ...


    Upgrades from System Platform on 6.x to Appliance Virtualization Platform on Avaya Aura® Release 7.0
    In Release 7.0, you can select the applications that are installed on a server. Therefore, when planning for upgrade to Release 7.0, you must ensure that correct application OVA files are included. (more on this on page 33)


    Hope these help
    Arbi

    Leave a comment:


  • aa1
    replied
    CM 7.0 Upgrade

    Take a look at these documents:

    Upgrading and Migrating Avaya Aura® applications to Release 7.0
    Release 7.0 Issue 1 November 2015



    Migrating and Installing Avaya Appliance Virtualization Platform
    Release 7.0 Issue 1 November 2015


    Arbi

    Leave a comment:


  • cef2lion
    replied
    I did some further reading. Might not have this exactly right.

    There is a Appliance Virtualization Platform Drive Kit. Looks like you backup. Remove your existing drives and save in case you need to rollback. Install the drives in the kit then AVP and CM. Then migrate your backups into Aura 7 CM. If something you goes wrong you can roll back with the original drives.

    Leave a comment:


  • cef2lion
    replied
    If we are currently running 6.3 on system platform on our DL360G7. Do we need to wipe system platform on the DL360G7 and load Appliance Virtualization Platform (AVP). to support installing CM OVA?

    If above is true how would one upgrade given you need to wipe the production system to load AVP.

    I do have VMware ESXi version 6 running to support System Manager 6.3 which I run now.

    Craig
    Last edited by cef2lion; 11-11-2015, 01:39 PM.

    Leave a comment:

Loading