DEFINITY Made Easy Home Page Table of contents Previous page Next page Index Links Frequently asked questions
Go to Upgrades for si Go to Installation for MCC Go to Installation for SCC



Connect Small Battery Holdover

Return to Task List

Connect the small battery holdover cable to J20. See Power Distribution Unit (J58890CH).

Power Distribution Unit (J58890CH)

Figure Notes:
      1. Connect small battery holdover cable (or temperature sensor cable from large battery cabinet) to J20

      2. Carrier Circuit Breakers

      3. Ground Terminal Block

      4. Connect -48 VDC Return - 1 AWG (50 mm 2) red cable here.

      5. Connect -48 VDC - 1 AWG (50 mm 2) black cable

      6. 1 AWG (50 mm 2) 50 ft (15.2 m) cable to large battery cabinet. For cables greater than 50 ft (15.2 m), contact your Avaya representative.

      7. Ground Terminal Block

      8. To AC load center or approved single-point ground block

Return to Task List


DEFINITY Made Easy Home Page Table of contents Previous page Next page Index Links Frequently asked questions
Go to Upgrades for si Go to Installation for MCC Go to Installation for SCC
Copyright 2001 Avaya Inc.
Send comments to MadeEasy Development Team



Always check at the Made Easy Web site for the most current information.