DEFINITY Made Easy Tools
Issue 3, December 2001
Installing the Stratum 3 Clock
Connect Clock Cabinet Grounding
- Measure and cut a 6 AWG (#40) (16 mm 2) wire long enough to reach from the clock cabinet to the ground discharge bar in the DC power plant.
- Insert 1 end of the wire into the ground lug on the clock cabinet and tighten the screw.
- Attach the lug to the receptacle cover. Be sure the lug and cabinet ground wires connect to separate screws on the receptacle cover.
- Route the ground wire to the DC power plant and connect to DISCH GRD inside the cabinet.
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
Copyright� 2001 Avaya Inc. |
Send comments to MadeEasy Development Team |
Always check at the Made Easy Web site for the most current information. |