DEFINITY Made Easy Home Page Table of contents Previous page Next page Index Links Frequently asked questions
Go to Upgrades for si Go to Installation for MCC Go to Installation for SCC



Connect Clock Cabinet Grounding

Return to Task List

  1. Measure and cut a 6 AWG (#40) (16 mm 2) wire long enough to reach from the clock cabinet to the ground discharge bar in the DC power plant.

  2. Insert 1 end of the wire into the ground lug on the clock cabinet and tighten the screw.

  3. Attach the lug to the receptacle cover. Be sure the lug and cabinet ground wires connect to separate screws on the receptacle cover.

  4. Route the ground wire to the DC power plant and connect to DISCH GRD inside the cabinet.


DEFINITY Made Easy Home Page Table of contents Previous page Next page Index Links Frequently asked questions
Go to Upgrades for si Go to Installation for MCC Go to Installation for SCC
Copyright 2001 Avaya Inc.
Send comments to MadeEasy Development Team



Always check at the Made Easy Web site for the most current information.