DEFINITY Made Easy Tools
Issue 3, December 2001
G3V4vs/R5vs/R6vs to R10si (On-Site)
Move circuit packs from G3V4vs System to R10si
- Label each port circuit pack in the G3V4vs with its slot number.
- Remove all circuit packs from the G3V4vs. Store the circuit packs in the static-proof packaging.
- Remove and keep all circuit pack blanks.
- Install the power unit and the remaining control circuit packs into the new si cabinet.
- Install the port circuit packs into their corresponding slots in the control cabinet.
- Install blank face plates in any vacant slots.
- Insert the old translation card into the Net/Pkt interface circuit pack.
The new control cabinet has more port slots than the G3V4vs cabinet so you should not need to retranslate these circuit packs.
| Copyright� 2001 Avaya Inc. |
| Send comments to MadeEasy Development Team |
| Always check at the Made Easy Web site for the most current information. |