Upgrade Procedures for DEFINITY R10si
Preparation and Process Steps for Upgrades
Minimum required hardware for R10si
Task List: R5/R6/R7/R8si to R10si
Test single-carrier cabinet systems
Test multi-carrier cabinet systems
Test telephones and other equipment
Test single-carrier cabinet systems
Test multi-carrier cabinet systems
Test telephones and other equipment
G3V4vs/R5vs/R6vs to R10si (On-Site)
Task List: DEFINITY vs to R10si
Test single-carrier cabinet systems
Test multi-carrier cabinet systems
Test telephones and other equipment
AC-powered cabinet port carrier power upgrade compatibility
Install Fiber Optic Cable Pass-Thru Kit (Multicarrier Cabinets)
Install the fiber optic cable pass-thru kit (MCC)
Install Fiber Optic Cable Pass-Thru Kit (Single-Carrier Cabinets)
Install the fiber optic cable pass-thru kit (SCC)
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |