Check customer options [G3V4vs, R5vs, R6vs to R10si]
Return to Task List
High or critical reliability:
- Verify that the switches are in
auto: Type
status system 1 and press
Enter.
Verify that conditions are normal (this can take as long as 5 to 10 minutes). If the system refuses to go onto a normal condition, refer to the maintenance procedures; if that fails, escalate the problem.
All:
- Type
display system-parameters customer-options and press
Enter.
Check that the
G3 version: field is
V10.
Return to Task List