DEFINITY Made Easy Home Page Table of contents Previous page Next page Index Links Frequently asked questions
Go to Upgrades for R9 Go to Installation for MCC Go to Installation for SCC



Optical Drive: Power Up the SPE [R9r]

Return to Task List


Note: The SPE reboots from the disk on the initial (original) software load. This preserves the original software when transitioning to the new hardware and software.

  1. If there are two power supplies, restore power to the SPE by inserting the power plug on the right side of the carrier then by inserting the power plug on the left side of the carrier. If there is only one power supply, insert the one power plug on the right side.

  2. For high or crtical reliability systems, monitor the SPE as it reboots by observing the LEDs and the terminal. The SPE is powered up when the YELLOW LED on the Processor circuit pack blinks in a steady state, which takes about 10 minutes.


DEFINITY Made Easy Home Page Table of contents Previous page Next page Index Links Frequently asked questions
Go to Upgrades for R9 Go to Installation for MCC Go to Installation for SCC
Copyright 2000 Avaya Inc
Send comments to MadeEasy Development Team



Always check at the Made Easy Web site for the most current information.