DEFINITY Made Easy Home Page Table of contents Previous page Next page Index Links Frequently asked questions
Go to Upgrades for R9 Go to Installation for MCC Go to Installation for SCC


Upgrades for R9 Made Easy

Upgrade Procedures for DEFINITY R9

Before you begin any upgrade

Blowback vs. On site?

Comments?

What DEFINITY System Is This?

Preparation and Process Steps for Upgrades

Preparation and process steps

Make the Blowback Tape

Special Administration Requirements

What's New in Release 9

Features

New port hardware

Discontinued hardware

Tools

Commands, screens, and fields

Cautions and warnings

New for R9si

Minimum required hardware for R9si

New control hardware for R9si

New procedures for R9si

Upgrade tips for R9si

New for R9r

Minimum required hardware for R9r

New control hardware for R9r

New procedures for R9r

Upgrade tips for R9r

New for R9csi

Minimum required hardware for R9csi

New control hardware for R9csi

New procedures for R9csi

Upgrade tips for R9csi

Release 5/6/7/8csi to R9csi

Before you begin the upgrade

Verify the required hardware [R9csi]

Provide the required tools [R9csi]

Check SPE [R9csi]

Verify Software Version [R9csi]

Verify System Status [R9csi]

Disable Scheduled Maintenance and Alarm Origination to INADS [R9csi]

Check Link Status [R9csi]

Check IP Softphones (R8 to R9 only) [R9csi]

Disable TTI [R9csi]

Save translation to the original translation flashcard [R9csi]

Save Announcements (if necessary) [R9csi]

Shut Down DEFINITY AUDIX System [R9csi]

Replace Circuit Packs [R9csi]

Display Memory-Configuration [R9csi]

Set Daylight Savings Rules [R9csi]

Set Date and Time [R9csi]

Verify the Upgrade [R9csi]

Readminister TTI [R9csi]

Enable Scheduled Maintenance and Alarm Notification [R9csi]

Enable Customer Options and Alarm Origination to INADS [R9csi]

Verify Link Status [R9csi]

Power Up DEFINITY AUDIX System [R9csi]

Resolve Alarms [R9csi]

Restore Announcements [R9csi]

Check SPE [R9csi]

Install R9csi translation card [R9csi]

Save Translations to R9 flashcard [R9csi]

Save Announcements, if necessary [R9csi]

Return Equipment [R9csi]

G3rV2/3/4 and R5/6/7/8r to R9r

R9r hardware requirements

References

Before you begin the upgrade

Upgrading TN1657 V8 or earlier (Steps 10 through 13)

Replacing the tape drive with the optical drive (steps 19 through 33)

Upgrading Circuit Packs (steps 34 through 47)

Verify the required hardware [R9r]

Provide the required tools [R9r]

Check SPE [R9r]

Disable Scheduled Maintenance and Alarm Origination to INADS [R9r]

Check Link Status [R9r]

Check IP Softphones (R8 to R9 only) [R9r]

Disable TTI [R9r]

Save Translations (pre-upgrade) [R9r]

Save Announcements (if necessary--pre-upgrade) [R9r]

Back Up Disk (pre-upgrade) [R9r]

Check Disk Drive [R9r]

Replace Disk Drive [R9r]

Restore Disk (Standard Reliability) [R9r]

Restore Disk (High or Critical Reliability) [R9r]

Reconfigure the Tape (G3rV2, V3 R31.0 and Earlier) [R9r]

Standard reliability:

High or critical reliability:

Check ISDN Signaling Group States [R9r]

Busyout MMI Circuit Packs (High/Critical reliability only) [R9r]

Shut Down DEFINITY LAN Gateway System [R9r]

Shut Down DEFINITY AUDIX System (if necessary) [R9r]

Check the Currency of the Removable-Media Drive and MSSNET [R9r]

For Systems having TN2211 Optical Drive(s) and UN332C MSSNET(s):

For Standard Reliability:

For High or Critical Reliability:

Tape Drive: Lock the active SPE (High/Critical reliability only) [R9r]

Tape Drive: Check the active tone-clock (High/Critical reliability only) [R9r]

Tape Drive: Power Down the SPE [R9r]

Replace the UN332B and Tape Drive with the UN332C and Optical Drive [R9r]

Verify TDM Cables and Connectors [R9r]

Optical Drive: Power Up the SPE [R9r]

Optical Drive: Unlock the Active SPE (High/Critical reliability only) [R9r]

Optical Drive: Verify Interchange (High/Critical reliability only) [R9r]

Upgrade Second Carrier to Optical Drive (High/Critical reliability only) [R9r]

Affix position label(s) [R9r]

Verify software version [R9r]

Save Translations [R9r]

Save Announcements (if necessary) [R9r]

Restore Disk [R9r]

Lock the Active SPE (High/Critical reliability only) [R9r]

Check the Active Tone-Clock (High/Critical reliability only) [R9r]

Power Down the SPE [R9r]

Add Memory and DUPINT Circuit Pack(s) [R9r]

Power Up the SPE [R9r]

Unlock the Active SPE (High/Critical reliability only) [R9r]

Verify Interchange (High/Critical reliability only) [R9r]

Lock Switches to Other Carrier (High/Critical reliability only) [R9r]

Check the Active Tone-Clock (High/Critical reliability only) [R9r]

Power Down the Other SPE (High/Critical reliability only) [R9r]

Add Memory and DUPINT Circuit Pack(s) (High/Critical reliability only) [R9r]

Power Up the Other SPE (High/Critical reliability only) [R9r]

Unlock the Active SPE (High/Critical reliability only) [R9r]

Verify Interchange for Other SPE (High/Critical reliability only) [R9r]

Verify that the system recognizes the replaced circuit packs [R9r]

Verify software version [R9r]

Set Daylight Savings Rules [R9r]

Set Date and Time [R9r]

Set Locations [R9r]

Enable TTI [R9r]

Release MMI (High/Critical reliability only) [R9r]

Resolve Alarms [R9r]

Check Link Status [R9r]

Check ISDN Signaling Group States [R9r]

Enable Scheduled Maintenance and Alarm Notification [R9r]

Administer Customer Options and Enable Alarm Origination to INADS [R9r]

Verify the Upgrade [R9r]

Save Translations (post-upgrade) [R9r]

Save Announcements (if necessary--post-upgrade) [R9r]

Power Up DEFINITY LAN Gateway System [R9r]

Power Up DEFINITY AUDIX System [R9r]

Back Up Disk [R9r]

Set Core Dump Vector [R9r]

Verify Survivable Remote EPNs [R9r]

Return Replaced Equipment [R9r]

G3i V2/3/4 to R9si (On-Site)

Introduction

References

About circuit-pack carriers

Before you begin the upgrade

Verify the required hardware [G3i V2/3/4 to R9si]

Provide the required tools [G3i V2/3/4 to R9si]

Check existing software load [G3i V2/3/4 to R9si]

Verify system status [G3i V2/3/4 to R9si]

Disable scheduled maintenance and alarm origination [G3i V2/3/4 to R9si]

Record all links and remove only ISDN interface links [G3i V2/3/4 to R9si]

Disable TTI [G3i V2/3/4 to R9si]

Save translation [G3i V2/3/4 to R9si]

Save translation, duplicated system[G3i V2/3/4 to R9si]

Save announcements [G3i V2/3/4 to R9si]

Shut down DEFINITY LAN Gateway [G3i V2/3/4 to R9si]

Shut down DEFINITY AUDIX system [G3i V2/3/4 to R9si]

Power down PPN [G3i V2/3/4 to R9si]

Remove translation card and CPP1, TN777B, and TN786B circuit packs [G3i V2/3/4 to R9si]

Install TN2404 and TN2401 circuit packs and original translation card [G3i V2/3/4 to R9si]

Verify TDM cables and terminators [G3i V2/3/4 to R9si]

Power up [G3i V2/3/4 to R9si]

Verify upgrade [G3i V2/3/4 to R9si]

Set date, time, and daylight savings rule [G3i V2/3/4 to R9si]

Enable customer options and alarm origination [G3i V2/3/4 to R9si]

Verify the upgrade [G3i V2/3/4 to R9si]

Run acceptance tests [G3i V2/3/4 to R9si]

Test single-carrier cabinet systems

Test multi-carrier cabinet systems

Test telephones and other equipment

Readminister TTI [G3i V2/3/4 to R9si]

Enable Scheduled Maintenance and Alarm Notification

Restore announcements [G3i V2/3/4 to R9si]

Rerecord announcements [G3i V2/3/4 to R9si]

Save announcements and translation [G3i V2/3/4 to R9si]

Register the upgraded switch [G3i V2/3/4 to R9si]

Return equipment to MSL [G3i V2/3/4 to R9si]

R5si/R6si/R7si/R8si to R9si

Introduction

About circuit-pack carriers

Before you begin the upgrade

Verify the required hardware [R9si]

Provide the required tools [R9si]

Verify the software version [R9si]

Verify system status [R9si]

Modify external alarm connections [R9si]

Label and connect cables [R9si]

Disable scheduled maintenance and alarm origination [R9si]

Check link status [R9si]

Record all links and remove only ISDN interface links (R6si or earlier) [R9si]

Check IP Softphones (R8 to R9 only) [R9si]

Disable TTI [R9si]

Save translation [R9si]

Save announcements [R9si]

Shut down DEFINITY LAN Gateway [R9si]

Shut down DEFINITY AUDIX system [R9si]

Determine active SPE [R9si]

Power down control carrier (simplex) [R9si]

Verify TDM cables and connectors [R9si]

Remove translation card, TN790/B, TN778, TN777B or TN794 or TN794/TN2400 circuit packs [R9si]

Remove TN765 circuit pack [R9si]

Replace TN772 duplication interfaces with the TN792 duplication interfaces (R6si or earlier) [R9si]

Install TN2404 and TN2401 circuit packs and original translation card [R9si]

Power up and set date, time, and daylight savings rule [R9si]

Upgrade other carrier [R9si]

Affix label [R9si]

Verify the upgrade [R9si]

Verify software version [R9si]

Re-enable scheduled maintenance and alarm notification [R9si]

Enable customer options and alarm origination [R9si]

Administer customer options [R9si]

Check link status [R9si]

Power up DEFINITY LAN Gateway system [R9si]

Power up DEFINITY AUDIX system [R9si]

Resolve alarms [R9si]

Run acceptance tests [R9si]

Test single-carrier cabinet systems

Test multi-carrier cabinet systems

Test telephones and other equipment

Readminister TTI and alarm notification [R9si]

Restore announcements [R9si]

Rerecord announcements [R9si]

Check SPE [R9si]

Save announcements and translation [R9si]

Register the upgraded switch [R9si]

Return equipment to MSL [R9si]

G3vs/R5vs/R6vs to R9si (On-Site)

Before you begin the upgrade

Verify the required hardware [G3vs, R5vs, R6vs to R9si]

Provide the required tools [G3vs, R5vs, R6vs to R9si]

Unpack and inspect control cabinet [G3vs, R5vs, R6vs to R9si]

Install new control cabinet [G3vs, R5vs, R6vs to R9si]

Install new control cabinet with earthquake protection [G3vs, R5vs, R6vs to R9si]

Label and connect cables [G3vs, R5vs, R6vs to R9si]

Install TDM/LAN bus terminators [G3vs, R5vs, R6vs to R9si]

Swing existing system into maintenance position [G3vs, R5vs, R6vs to R9si]

Check existing software load [G3vs, R5vs, R6vs to R9si]

Verify system status [G3vs, R5vs, R6vs to R9si]

Disable scheduled maintenance and alarm origination [G3vs, R5vs, R6vs to R9si]

Check link status [G3vs, R5vs, R6vs to R9si]

Record all links and remove only ISDN interface links [G3vs, R5vs, R6vs to R9si]

Disable TTI [G3vs, R5vs, R6vs to R9si]

Save translation [G3vs, R5vs, R6vs to R9si]

Save recorded announcements (TN750B) [G3vs, R5vs, R6vs to R9si]

List configuration software version [G3vs, R5vs, R6vs to R9si]

Shut down DEFINITY LAN Gateway system [G3vs, R5vs, R6vs to R9si]

Shut down the DEFINITY AUDIX system [G3vs, R5vs, R6vs to R9si]

Power down existing system [G3vs, R5vs, R6vs to R9si]

Remove ground connections [G3vs, R5vs, R6vs to R9si]

Move 25-pair cables from G3vs System to R9si

Move management terminal cable from G3vs System to R9si

Move circuit packs from G3vs System to R9si

Verify TDM cables and connectors [G3vs, R5vs, R6vs to R9si]

Connect control cabinet power and ground [G3vs, R5vs, R6vs to R9si]

Power up and set date, time, and daylight savings rule [G3vs, R5vs, R6vs to R9si]

Enable customer options and alarm origination [G3vs, R5vs, R6vs to R9si]

Verify the upgrade [G3vs, R5vs, R6vs to R9si]

Run acceptance tests [G3vs, R5vs, R6vs to R9si]

Test single-carrier cabinet systems

Test multi-carrier cabinet systems

Test telephones and other equipment

Readminister TTI [G3vs, R5vs, R6vs to R9si]

Enable Scheduled Maintenance and Alarm Notification [G3vs, R5vs, R6vs to R9si]

Restore announcements [G3vs, R5vs, R6vs to R9si]

Rerecord announcements [G3vs, R5vs, R6vs to R9si]

Save announcements and translation [G3vs, R5vs, R6vs to R9si]

Register the upgraded switch [G3vs, R5vs, R6vs to R9si]

Disassemble the G3vs System [G3vs, R5vs, R6vs to R9si]

Return equipment to MSL [G3vs, R5vs, R6vs to R9si]

Preparation and process steps

Make the Blowback Tape

DEFINITY Hardware

Circuit Packs for R9

Required circuit packs (si)

Required circuit packs (csi)

Required circuit packs (r)

Optional circuit packs

Non-US circuit packs

List of Circuit Packs

631DA1

631DB1

644A1

645B1

649A

650A

676C

982LS

1217A

CFY1B

ED-1E546

ED-1E546

ED-1E568

J58890MA-1

NAA1

TN429B/C/D

TN433

TN436B

TN438B

TN439

TN457

TN459B

TN464C/D/E/F/GP

TN479

TN553

TN556B/C/D

TN566B

TN567

TN568

TN570B/C

TN572

TN573B

TN577

TN725B

TN726B

TN735

TN744B/C/D

TN746B

TN747B

TN750B/C

TN753B

TN754B/C

TN755B

TN758

TN760D/E

TN762B

TN763B/C/D

TN765

TN767B/C/D/E

TN768

TN769

TN771DP

TN772

TN775B/C

TN776

TN780

TN786B

TN787F/G/H/J/K

TN788B

TN789

TN790

TN790B

TN791

TN792

TN793

TN794

TN794/TN2400

TN795

TN797

TN798B

TN799/TN799B

TN799C

TN801 MAPD

TN802/TN802B MAPD

TN1648B

TN1650B

TN1654

TN1655

TN1656

TN1657

TN2138

TN2139

TN2140B

TN2146

TN2147C

TN2169

TN2170

TN2180

TN2181

TN2182B

TN2184

TN2185B

TN2198

TN2199

TN2202

TN2207

TN2208

TN2209

TN2210

TN2211

TN2214B

TN2215/TN2183

TN2224B

TN2238

TN2242

TN2301

TN2302AP

TN2305

TN2306

TN2308

TN2313AP

TN2400

TN2401

TN2402

TN2404

TN2464BP

TN2793/TN2793B

TN-CCSC-1

TN-CCSC-2

TN-CCSC-3

TN-C7

TN-CIN

UN330B

UN331C

UN332C

AC-powered cabinet port carrier power upgrade compatibility

Alarm connections

Redistribution methods

Results of ganging method

Port-network configurations

Install Fiber Optic Cable Pass-Thru Kit (Multicarrier Cabinets)

LASER Product

Prepare the cabinet

Install the Pass-Thru Kit

Test the Installation

Install Fiber Optic Cable Pass-Thru Kit (Single-Carrier Cabinets)

LASER Product

Prepare the cabinet

Install the Fiber-optic Cable with the Pass-thru Kit

Test the Installation

Install fiber optic cable for duplicated SCC systems

Access Security Gateway

Using the ASG Mobile


DEFINITY Made Easy Home Page Table of contents Previous page Next page Index Links Frequently asked questions
Go to Upgrades for R9 Go to Installation for MCC Go to Installation for SCC
Copyright 2000 Avaya Inc
Send comments to MadeEasy Development Team



Always check at The Made Easy Web site for the most current information.