Provide the required tools [75 small upgrade]
Return to Task List
The following tools and items may be required during the upgrade:
- Flash maintenance kit (MTCE 00037), acquired from MSL (control-carrier replacement only)
- High-intensity drop light or flashlight
- 3/8-inch flat-blade screwdriver with a 10-inch shank (minimum)
- 5/16-inch and 1/4-inch sockets with a ratchet and 10-inch extension
- Power screwdriver (optional)
- Pliers (for cabinet replacement, long-nose pliers to disconnect grounding straps and straighten backplane pins)
- Static-proof or original circuit-pack packaging for transporting circuit packs
- Labels for labeling the cables attached to the rear of cabinets and port circuit pack
- Receptacle for holding approximately 100 self-tapping screws
- Twelve spare #12 and #10 self-tapping screws
- Four spare carrier grounding straps
- Authorized wrist grounding strap
- Cabinet air filter (may be required)
- Backplane pin repair kit (KS-22876-L2 or equivalent)
- Documentation (book or PDF file) for the current release:
- DEFINITY Enterprise Communications Server Maintenance
- DEFINITY Enterprise Communications Server Administrator's Guide
Return to Task List