This topic explains
how to administer the switch to perform acceptance tests for the INTUITY
AUDIX system and to cut the system over to service.
To run acceptance tests and cut the INTUITY AUDIX system
in to service, you must perform the following two tasks:
- Administer the coverage path.
- Administer the subscriber
stations.

Do not administer subscribers on the switch until the
INTUITY AUDIX system is installed and you are ready to provide
messaging services to system subscribers.
|
Administration Procedures
Whether carrying out the acceptance tests or cutting to service, the same two procedures must be completed:
- Administer the coverage path.
- Administer the subscriber stations.
For acceptance tests, you must:
- Administer two test stations.
- Assign Call Coverage paths to those stations.
- Run the acceptance tests.
- Remove the test stations when testing is complete.
See System Acceptance Test for acceptance testing procedures.
For cut-to-service, you must:
The sample screens used in this section
show DEFINITY ECS screens. All of the supported switches use screens
that appear to be similar to these screens. The text explains any differences
between the switch screens.
Assign the Call Coverage Path
Define a call coverage path for the subscribers with the INTUITY AUDIX hunt group as a coverage point. You might need to define several call coverage paths, depending on how the customer wants to handle call coverage for different groups of subscribers. If the INTUITY AUDIX system has been integrated with an existing switch, you might need to add the INTUITY AUDIX hunt group as another coverage point for existing coverage paths.
Use the following procedure to define a call coverage path:
- Log in to the switch by entering the craft or inads user ID.
- Enter your password.
- Enter the correct terminal type.
The system displays the command prompt.
- Enter add coverage path coverage path number at the
enter command
prompt. See Worksheet F: Call Coverage Path in Switch Integration Planning to find the call coverage path number.
The system displays the Coverage Path Screen.
- Use Worksheet F: Call Coverage Path in Switch Integration Planning to enter the correct values in the fields on the Coverage Path screen.
- Press ENTER to save your changes.
- Continue with Modify the Station Screen for Each Subscriber.
Modify the Station Screen for Each Subscriber
After you administer the call coverage
path, you must administer the subscriber stations (only two, if you
are doing acceptance testing). Each subscriber station must contain
the correct information for the INTUITY AUDIX system to operate. Use
the following procedure to modify the stations:
- Enter change station test station extension at the
enter command
prompt.
See Adding Subscribers for more information about adding test subscribers.
Note:
If you receive the message <station extension> Identifier not assigned , you entered a station extension that does not exist in the system. Use the add station command to add the subscriber station.
|
The system displays the Station Screen, Page 1.
- Enter the coverage path you created for the INTUITY AUDIX system in Assign the Call Coverage Path above. If you do not remember the coverage path number, see Worksheet F: Call Coverage Path, in Switch Integration Planning.
- Press NEXTPAGE to move to Page 2.
The system displays the Station Screen, Page 2.
- Enter AUDIX in the
LWC Reception
field.
- Enter y in the
LWC Activation
field if the subscriber is assigned the Leave Word Calling feature.
- Enter y in the
Redirect Notification
field.
- Enter led, neon, or audible in the
Message Waiting Indicator:
field if the voice terminal has a message waiting indicator (MWI) lamp. This instruction applies to 500, 2500, and 7104A telephones only.
- Press ENTER to save your changes.
- Repeat this procedure for the two test stations or the subscriber stations.