TOC Index Search

 

Releasing the Switch Data Link


 

Important! This task applies only to DEFINITY switches. If the customer does not have a DEFINITY switch, do not use this task and go to the next task, Verifying the Cable Connections.

For this procedure, DEFINITY switches are divided as follows:

Releasing the Data Link on a System 75 G1 or G3 Switch

To release the data link on a System 75 G1 or G3 switch, perform the following tasks on the switch administration terminal (SAT):

  1. Enter release link n
  2. where n is the number of the link going to the Avaya Intuity system. Valid input is an integer from 1 to 8.

    For more information, see the DEFINITY switch documentation.

  3. Continue with the next task, Verifying the Cable Connections.

Releasing the Data Link on a G2 Switch

To release the data link on a G2 switch, perform the following tasks on the switch administration terminal (SAT):

  1. Enter proc650 test 3
  2. Enter rb
  3. For more information, see the DEFINITY switch documentation.

  4. Continue with the next task, Verifying the Cable Connections.

Releasing the Data Link in an OverLAN Integration

To release the data link in an OverLAN switch integration, perform the following tasks on the switch administration terminal (SAT):

  1. Enter ch com p
  2. Locate Intuity AUDIX in the Node column.
  3. Press the DOWN ARROW key to the Intuity AUDIX field.
  4. Enter y
  5. The system displays the following message:

    Command successfully completed.

  6. Continue with the next task, Verifying the Cable Connections.

Avaya Communication
http://www.avaya.com
Avaya UCS Information Development
TOC Index Search