Installing Redundant Hardware
To install redundant hardware:
- Turn off all of the switch power supplies.
- Replace the Primary switch controller with the new switch controller. This ensures that the switch checks the status of the new switch controller.
- Insert the previously Primary switch controller into the Redundant Controller Slot 1 (see Figure�84 for a P580 or Figure�85 for a P882).
Note: Controllers and elements are keyed to ensure that a controller is not inserted into an element slot.
- Install the redundant element into the redundant element slot 0 for the P580, (see Figure�84), or slot 6 for the P882, (see Figure�85).
- Turn on the switch power supplies and log in.
- Enable the Redundant Hardware as described in the next section.