Hi To all,
We are trying to configure the MPS 500 Rls 3.0 to EuroISDN. We are using the isdn_net5_proto.cfg. We changed the mf to crc4 as the E1 is using crc4.
The TMS span LED is Green however we still have the D-Channel link down.
Below is the output of "dlt spanstatus 1"
Span Type: E1 ISDN (basic)
Span Status: In service
Alarm State: Green
Alarm Recieved: (None)
Alarm Transmitted: (None)
Span Conditions: (None)
Loopback: Disabled
Source of Timing: Yes
Number of Channels: 30
Channels Online: ALL
D_Channel Status: Link_Down
Please help
Thanks in advance!
We are trying to configure the MPS 500 Rls 3.0 to EuroISDN. We are using the isdn_net5_proto.cfg. We changed the mf to crc4 as the E1 is using crc4.
The TMS span LED is Green however we still have the D-Channel link down.
Below is the output of "dlt spanstatus 1"
Span Type: E1 ISDN (basic)
Span Status: In service
Alarm State: Green
Alarm Recieved: (None)
Alarm Transmitted: (None)
Span Conditions: (None)
Loopback: Disabled
Source of Timing: Yes
Number of Channels: 30
Channels Online: ALL
D_Channel Status: Link_Down
Please help
Thanks in advance!