DEFINITY Made Easy Tools
Issue 3, December 2001
Install and Connect Multi-Carrier Cabinets
Position the Auxiliary Cabinet (Optional)
- Position the Auxiliary cabinet next to the PPN cabinet (or EPN cabinet, if installed). The location of equipment inside the Auxiliary cabinet is specified in the Customer Service Document (CSD).
- If earthquake protection is required, Install Earthquake Protection for MCC.
- If earthquake protection is not required, level the cabinets and adjust and lock the cabinet stabilizing bolts to keep the cabinet from moving.
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |