Test Stratum 3 Clock (if used)

Return to Task List

These procedures test the ability of the Stratum 3 clock to correctly provide timing and alarms to the system.


Caution! The following procedures are destructive to DS1 data and should not be attempted while DS1 facilities are active.

Task List: Test Stratum 3 Clock

  1. Check for Red LEDs

  2. Verify Timing to the System