DEFINITY Made Easy Home Page Table of contents Previous page Next page Index Links Frequently asked questions
Go to Upgrades for si Go to Installation for MCC Go to Installation for SCC



Install new control cabinet [75 XE upgrade]

Return to Task List

The new control cabinet already contains a processor circuit pack, and the network control and packet control mechanism are already in place.


Danger! The cabinet may weigh as much as 130 pounds and requires 2 handlers. Use caution to avoid injury.

  1. Position the J58890L control cabinet A at the desired location. This should be as close to the MDF as possible.

  2. Install hole plugs (provided with cabinet) in the holes previously occupied by the two carriage bolts at the bottom rear of the cabinet.

Return to Task List


DEFINITY Made Easy Home Page Table of contents Previous page Next page Index Links Frequently asked questions
Go to Upgrades for si Go to Installation for MCC Go to Installation for SCC
Copyright 2001 Avaya Inc.
Send comments to MadeEasy Development Team



Always check at the Made Easy Web site for the most current information.