DEFINITY Made Easy Home Page Table of contents Previous page Next page Index Links Frequently asked questions
Go to Upgrades for si Go to Installation for MCC Go to Installation for SCC



Inspect the new control carrier and install CURL [75 small upgrade]

Return to Task List

Note

This procedure is for control-carrier replacement upgrades only.

  1. Visually inspect the new carrier for any damage. Verify that the backplane pins are not bent.

  2. Place the enhanced control carrier on the floor so that the rear of the carrier faces up.

  3. Install the 982LS current limiter (CURL) on the A carrier to the pin-field block marked CURL. The CURL is inserted with the components on the left side as viewed from the rear.

  4. At the rear connector panel, determine which connectors will have a cable attached, and install a 4B cable retainer on each of these connectors.

Return to Task List


DEFINITY Made Easy Home Page Table of contents Previous page Next page Index Links Frequently asked questions
Go to Upgrades for si Go to Installation for MCC Go to Installation for SCC
Copyright 2001 Avaya Inc.
Send comments to MadeEasy Development Team



Always check at the Made Easy Web site for the most current information.