DEFINITY Made Easy Home Page Table of contents Previous page Next page Index Links Frequently asked questions
Go to Upgrades for R9 Go to Installation for MCC Go to Installation for SCC



Power down control carrier (simplex) [R9si]

Return to Task List

For a duplex system, power down only the control carrier.


Caution! Important system data such as BCMS data, records of queued ACD calls, Automatic Wakeup requests, and Do Not Disturb requests will be lost on power down. You cannot store to or retrieve data from tape or flash.

  1. At the PPN power-distribution unit, set the main circuit breaker to OFF.

  2. If the site has a power-failure transfer panel, connect a ground strap to the panel and to a ground source. Verify that the power-failure stations are working.

  3. Remember to disconnect this strap before reapplying power.

Return to Task List


DEFINITY Made Easy Home Page Table of contents Previous page Next page Index Links Frequently asked questions
Go to Upgrades for R9 Go to Installation for MCC Go to Installation for SCC
Copyright 2000 Avaya Inc
Send comments to MadeEasy Development Team



Always check at the Made Easy Web site for the most current information.