Assembling the Rack-Mounted MAP/100P
The following sections and graphics contain the information needed to install the MAP/100P into a rack, install ferrites, locate key components, and provide proper clearance for the cooling system.
The Sample Rack-Mounted MAP/100P graphic shows a sample of a 19-inch by 30-inch (48.3-centimeter by 76.2-centimeter) commercial cabinet that houses three rack-mounted MAP/100P units. Each MAP/100P is shown with the front bezel removed.
Installing the MAP/100P into a Rack
To prevent accidental tipping, verify that the commercial cabinet is secured to the floor before mounting the MAP/100P.You can mount the MAP/100P into a commercial cabinet. Before beginning, verify the following:
- At least two installers are available to mount the MAP/100P into the rack.
- The cabinet equipment mounting rails are between 28 and 30 inches (71.2 and 76.2�centimeters) deep.
- The cabinet height will accommodate the number of units that need to be mounted.
- The rack-mount hardware provided with the MAP/100P is on-site, including the items listed in the table below:
The Mounting the MAP/100P in a Rack graphic shows the system mounting hardware.
To install the MAP/100P into a rack:
- Ensure that you have the required tools:
- Phillips set, large
- Flatblade screwdriver
- Mounting screws and captive clip nuts provided with the commercial cabinet
- Remove the front bezel.
- Remove the cabinet mounting bracket from the left and right side of the unit. The mounting bracket is held in place with eight screws.
- Reuse two screws to attach the extension bracket to the unit at the cabinet's depth dimension.
Note: Adding the extension bracket provides the necessary depth required for the MAP/100P to fit into the cabinet.
- Fully extend the cabinet slides to the locked-out position.
- With another installer supporting the unit, align the front mounting holes of the slide with those on the cabinet.
- Use two screws to attach the MAP/100P cabinet-mounting guide ends to the cabinet.
- Repeat Step 3 through Step 7 for the other side.
- Unlock the cabinet slide and check that the unit moves smoothly in and out of the cabinet.
- Push the unit completely into the rack.
- Use two screws and captive clip nuts on the front of each corner to secure the unit.
- Install the front bezel:
Installing Ferrites on the Rack-Mounted MAP/100P
Note: You must install all required ferrites before you begin installing your system.
See Installing a Ferrite for general information about installing ferrites. See Ferrite Configuration for ferrite information specific to the MAP/100P.
Once you have installed all required ferrites, begin assembling your system.
Key Components on the Front of the Rack-Mounted MAP/100P
Click the Front View of a Rack-Mounted MAP/100P with Front Bezel Removed graphic for a larger view and for a description of each component on the front of the rack-mounted MAP/100P.
Key Components on the Back of the Rack-Mounted MAP/100P
Click the Back View of the Rack-Mounted MAP/100P graphic for a larger view and for a description of each component on the back of the rack-mounted MAP/100P.
Cooling System for the Rack-Mounted MAP/100P
The cooling system for the MAP/100P includes two fans. One fan is located to the right of the circuit card cage area. The other cooling fan is located to the left of the circuit card cage area.
The fans maintain air flow in the unit to prevent components from overheating, which can cause a component to malfunction. To prevent overheating, you must also maintain adequate clearance on all sides of the unit so that air can circulate.