I would like to do the LSP failover test, so please let me know the best test plan.
I have a plan here----
Shut the WAN Link port from the switch with the help of network team. And do a No Shut after the Testing is over.
Can any one tell me how to disable the h.248 link from the gateway.
I have a plan here----
Shut the WAN Link port from the switch with the help of network team. And do a No Shut after the Testing is over.
Can any one tell me how to disable the h.248 link from the gateway.
Comment