Connect the UPS

Return to Task List

  1. Notify the customer of an EPN outage during this procedure.

  2. Turn off the SCC circuit breaker.

  3. Unplug the SCC from the commercial power source.

  4. Plug the SCC power cord into the UPS.

  5. Turn on the SCC circuit breaker.

  6. Plug the UPS into a 120 VAC NEMA 5-15R receptacle.

  7. Press and hold the OUTPUT ON button on the UPS until you hear a beep. The INPUT ON and OUTPUT ON LEDs light up.

  8. Program the UPS communication interface port for AS400 mode. Refer to the UPS Site Preparation, Installation and Operator's Manual, 167-405-120.

Return to Task List


DEFINITY Made Easy Home Page Table of contents Previous page Next page Index Links Frequently asked questions
Go to Upgrades for si Go to Installation for MCC Go to Installation for SCC
Copyright 2001 Avaya Inc.
Send comments to MadeEasy Development Team



Always check at the Made Easy Web site for the most current information.