DEFINITY Made Easy Tools
Issue 3, December 2001
UPS Installation for SCC EPN A-Carrier Cabinet
Connect the UPS
- Notify the customer of an EPN outage during this procedure.
- Turn off the SCC circuit breaker.
- Unplug the SCC from the commercial power source.
- Plug the SCC power cord into the UPS.
- Turn on the SCC circuit breaker.
- Plug the UPS into a 120 VAC NEMA 5-15R receptacle.
- Press and hold the OUTPUT ON button on the UPS until you hear a beep. The INPUT ON and OUTPUT ON LEDs light up.
- Program the UPS communication interface port for AS400 mode. Refer to the UPS Site Preparation, Installation and Operator's Manual, 167-405-120.
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
Copyright� 2001 Avaya Inc. |
Send comments to MadeEasy Development Team |
Always check at the Made Easy Web site for the most current information. |