![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
DEFINITY Made Easy Tools
Issue 3, December 2001
Index
A - B - C - D - E - F - G - H - I - J - K - L - M - N - O - P - Q - R - S - T - U - V - W - X - Y - Z
Index links show the title of the page to which they point.
Index
Numerics
100A Lightguide Interconnect Unit
10A Lightguide Connector Panel and Couplings
110A-type terminal blocks (SCC)
110P-type terminal blocks (MCC)
110P-type terminal blocks, frame-mounting
Mount 110P-type terminal blocks on a frame
110RA1-12 terminating resistor block
Terminating Resistor Adapter and Block
Main Distribution Frame (MDF) Hardware
Installation Space Requirements
110-type hardware, SCP-110 sneak current protection
110-type terminal blocks, wall-mounting
Mount 110A- or 110P-type terminal blocks on the wall
1110A2 apparatus mounting frame
Mount 110P-type terminal blocks on a frame
Mount 110P-type terminal blocks on a frame
Important Warning for 1145B Power Supply
Install the Wall-Mounting Plates
Mount the 1146B Power Distribution Unit
Wire the 1146B Power Distribution Unit
1151A1 and 1151A2 power supply
Important Safety Instructions for 1151A1 and 1151A2 Power Supplies
Connect the 1151A1 or 1151A2 Power Supplies
1151A1 and 1151A2 Power Supplies
1151A1 and 1151A2 Power Supplies
Add TN1654 DS1 Converter (R10r Only)
Mounting the 127A (TN1654 DS1 Converter)
Connect an Analog Station or 2-Wire Digital Station
Installing a 3150/3170 Channel Service Unit
Installing Multipoint Adapters
Three-Pair and Four-Pair Modularity
Connect Trunk Pairs to Cabinet Using Jumper Wires To Establish 3-Pair Modularity
3-pair to 4-pair station circuits
Station Circuit Distribution from Equipment Room
Circuit Pack and Auxiliary Equipment Leads (Pinout Charts)
440A4 terminating resistor adapter
Terminating Resistor Adapter and Block
Digital Out-of-Building Voice Terminal Protection
4C3S-75 enhanced protector, installing
Digital Out-of-Building Voice Terminal Protection
Station Circuit Distribution from Equipment Room
Set 7400A and 7400B Options (Modem Pooling)
Set the Data Module to DCE Mode
Set the Data Module Operating Mode
Set 7400A and 7400B Options (Modem Pooling)
Set the 7400B+ Data Module Options
Data Module Option Switch Settings
Emergency Transfer Units and Associated Telephones
808A Emergency Transfer Panel and Telephone Installation Examples
Install the 808A Emergency Transfer panel
Set the Data Module to DCE Mode
Set the Data Module Operating Mode
A
Connect the Power Cord into the Power Receptacle
Connect AC Power to Stratum 3 Clock Cabinet
Ground and Connect AC-Powered Cabinets
Position the Cabinets (Standard Reliability)
Position Cabinets (High or Critical Reliability)
acceptance testing, telephones
Test Telephones and Other Equipment
Adding CO, FX, WATS, and PCOL Trunks
Add U.S. Robotics Model USR 33.6 EXT External Modem to EPN
Add U.S. Robotics Model USR 33.6 EXT External Modem to PPN
Adding CO, FX, WATS, and PCOL Trunks
Installing ISDN - PRI Internationally
Enter Added Translations (ISDN PRI)
Add Packet Bus Support for R10si
Disable Alarm Origination (Packet Bus Support)
Power Up System (Packet Bus Support)
Test the Packet Bus and C-LAN Circuit Pack (Packet Bus Support)
Adding CO, FX, WATS, and PCOL Trunks
Add additional TN750C Circuit Packs
Adding TTC Japanese 2-Mbit Trunks
Adding CO, FX, WATS, and PCOL Trunks
Installing a 3150/3170 Channel Service Unit
Add a Data Module to the Switch
Verify Port Cabinet Address Plugs
Adjunct Power Connection Locations
administation terminals, connectable
Administering the Circuit Packs
administering fiber optic cable
Administering Fiber Optic Cables for R10r
Add Cabinet 2 through N (R10r)
administering patch cords and jumpers
Patch Cord/Jumper Installation and Administration
administering the attendant console
administering TN464GP and TN2464BP
Administering the Circuit Packs
administration commands, introduction
Administration Screens and Commands
administration terminals, connectable
Connectable Administration Terminals
Connect External Alarm Indicators and Auxiliary Power
Connect an Analog Station or 2-Wire Digital Station
Change Mu-Law to A-Law (for systems using A-Law companding only)
analog line circuit protectors
Off-Premises Protection Requirements
Connect an Analog Station or 2-Wire Digital Station
Move a Single Announcement from one Announcement Circuit Pack to another
announcements, moving from TN750B to TN750C
Replace a TN750 or TN750B with a TN750C or Move all Announcements from a TN750B to a TN750C
Connector and Cable Diagrams (Pinout Charts)
attendant console, administering
attendant console, cabling distances
connections through processor interface
AUDIX Interface Option Settings
DEFINITY AUDIX System Power Procedures
Automatic Registration Tool (ART)
Register the Switch for Maintenance
Circuit Pack and Auxiliary Equipment Leads (Pinout Charts)
auxiliary cabinet, cabling to MDF
Install Connector Cables Between Auxiliary Cabinet and MDF
Circuit Pack and Auxiliary Equipment Classifications
auxiliary equipment pin designations
Connector and Cable Diagrams (Pinout Charts)
Circuit Pack and Auxiliary Equipment Leads (Pinout Charts)
Circuit Pack and Auxiliary Equipment Leads (Pinout Charts)
Connect External Alarm Indicators and Auxiliary Power
Avaya R300 Remote Office Communicator
B
Install the Wall-Mounting Plates
Mount the 1146B Power Distribution Unit
Install the Battery Mounting/Wiring
Connect Optional Battery Leads
Install the Battery Mounting/Wiring
Install Coupled Bonding Conductor
Installing Multipoint Adapters
Install and Administer ISDN - BRI
fanout of multipoint installations
Installing Multipoint Adapters
Installing Multipoint Adapters
BRI Terminating Resistor Installation
C
Installation Space Requirements
Verify Port Cabinet Address Plugs
Install Cabinet Clips (Systems without Earthquake Protection)
Ground and Connect AC-Powered Cabinets
Position the Cabinets (Standard Reliability)
Position Cabinets (High or Critical Reliability)
Position the Cabinets (Standard Reliability)
Position Cabinets (High or Critical Reliability)
Install Cables Between Cabinet and MDF
cabinets, stabilizing for earthquake protection
Install Rear Ground Plates (Systems with Earthquake Protection)
Install Front Ground Plates (Systems with Radiation Shielding and Earthquake Protection)
Connector and Cable Diagrams (Pinout Charts)
Install Fiber Optic Cable Pass-Thru Kit (Single-Carrier Cabinets)
Install the Fiber-optic Cable with the Pass-thru Kit
Install fiber optic cable for duplicated SCC systems
Administering Fiber Optic Cables for R10r
cable clamps, for cable slack manager
Installation Space Requirements
cable installation,control carrier outputs
cable slack manager, installing
cable slack manager, space requirements
Installation Space Requirements
cable, attendant console cabling distances
Connect Time Division Multiplexing Bus Cables
Connect Time Division Multiplexing Bus Cables
High or Critical Reliability PPN - Two Cabinet Stack
High or Critical Reliability PPN - Three Cabinet Stack
Expansion Port Network (All Reliability Options)
Installation Space Requirements
cables, installing between auxiliary cabinet and MDF
Install Connector Cables Between Auxiliary Cabinet and MDF
cables, installing between cabinet and MDF
Install Cables Between Cabinet and MDF
call detail recording. See CDR.
Install the Queue Warning Indicator
Deliver License File (CallVisor ASAI)
Save Translations (CallVisor ASAI)
Enter Added Translations (CallVisor ASAI)
Changing the Feature Access Code
Changing the ARS Digit Analysis
Changing the CAMA Numbering and Class of Restriction
Off-Premises Protection Requirements
Call Detail Recording Option Settings
changing system maintenance parameters
Set System Maintenance Parameters
channel service unit. See CSU.
checking circuit pack configuration
Check Circuit Pack Configuration
Check Circuit Pack Configuration
Check System Status for Each Cabinet
circuit pack configuration, testing
Check Circuit Pack Configuration
Check Circuit Pack Configuration
circuit pack damage or discrepancies
Circuit Pack and Auxiliary Equipment Leads (Pinout Charts)
Circuit Pack and Auxiliary Equipment Leads (Pinout Charts)
Circuit Pack and Auxiliary Equipment Classifications
Check Circuit Pack Configuration
Connect Remotely to the DEFINITY ECS Through a Data Module
Connector and Cable Diagrams (Pinout Charts)
Administering the Circuit Packs
Administering the Circuit Packs
Administering the Circuit Packs
Administering the Circuit Packs
Administering the Circuit Packs
Perform Initial Administration Steps for C-LAN and IP Media Processor
Test the External Connection to the LAN
Downloading Firmware to Port Circuit Packs
test external connection to LAN
Test the External Connection to the LAN (Add DCS)
Test the External Connection to the LAN
Circuit Pack and Auxiliary Equipment Leads (Pinout Charts)
Connect an Analog Station or 2-Wire Digital Station
Circuit Pack and Auxiliary Equipment Leads (Pinout Charts)
Adding CO, FX, WATS, and PCOL Trunks
collocated DS1 tie trunks, wiring
Administration Screens and Commands
External Modem Option Settings
concentrator cables, connecting trunk pairs
Connect Trunk Pairs Using Concentrator Cables
Install Earthquake Protection for SCC
Connect the Power Cord into the Power Receptacle
connectable administration terminals
Connectable Administration Terminals
connectable voice and data terminals
connecting AC power to DC power cabinet
Connect AC Power to DC Power Cabinet
connecting control carrier outputs cable
Connect Control Carrier Outputs Cable
connecting external alarm indicators
Connect External Alarm Indicators and Auxiliary Power
Connecting and Handling Fiber Optic Cables
Standard Reliability PPN - One Cabinet Stack
High or Critical Reliability PPN - Two Cabinet Stack
High or Critical Reliability PPN - Three Cabinet Stack
Expansion Port Network (All Reliability Options)
Connecting Through a Channel Service Unit
connecting to the DEFINITY ECS
Connect Directly to the DEFINITY ECS
Connect Remotely to the DEFINITY ECS Through a Data Module
Connect Remotely to the DEFINITY ECS Through a Modem
connection diagrams, station cables
Station Circuit Distribution from Equipment Room
Call Detail Recording Option Settings
Connect Control Carrier Outputs Cable
control carrier outputs cable, installing
Install Coupled Bonding Conductor
Test Tone-Clock Interchange for Each Expansion Port Network
High or Critical Reliability PPN - Two Cabinet Stack
High or Critical Reliability PPN - Three Cabinet Stack
critical reliability systems, enabling duplication
Enable Duplication and Boot Critical Reliability System (R10r)
critical-reliability systems, cabling
Installing a 3150/3170 Channel Service Unit
Connecting Through a Channel Service Unit
Connecting Through a Channel Service Unit
D
data communications equipment connector
Call Detail Recording Option Settings
data link protector, installing
Digital Out-of-Building Voice Terminal Protection
Add a Data Module to the Switch
Set the Data Module Operating Mode
Set 7400A and 7400B Options (Modem Pooling)
Data Module Option Switch Settings
Set 7400A and 7400B Options (Modem Pooling)
Data Module Option Switch Settings
Data Module Option Switch Settings
Data Module Option Switch Settings
Set the Modem Connected to Data Module
Data Module Option Switch Settings
data module connection to DEFINITY ECS
Connect Remotely to the DEFINITY ECS Through a Data Module
data module DIP switch locations
Data Module Option Switch Settings
data module, setting to DCE mode
Set the Data Module to DCE Mode
DC distribution unit, connecting to DC power cabinet
Connect DC Power Distribution Unit Ground
Connect DC Power and Ground to Stratum 3 Clock Cabinet
Connect Stratum 3 Clock DC Power
connecting distribution unit to power cabinet
Connect DC Power Distribution Unit Ground
TN760D Tie Trunk Circuit Pack Option Settings
Connect AC Power to DC Power Cabinet
Connect Single-Carrier Cabinet Ground
DC power, connecting cabinet grounds
Connect DC Power Cabinet Ground
Position the Cabinets (Standard Reliability)
Position Cabinets (High or Critical Reliability)
Set the Data Module to DCE Mode
Data Module Option Switch Settings
DEFINITY ECS, connecting the PC
Connect Directly to the DEFINITY ECS
Connect Remotely to the DEFINITY ECS Through a Data Module
Connect Remotely to the DEFINITY ECS Through a Modem
DEFINITY ECS, connecting through a data module
Connect Remotely to the DEFINITY ECS Through a Data Module
DEFINITY ECS, connecting through a modem
Connect Remotely to the DEFINITY ECS Through a Modem
Connect an Analog Station or 2-Wire Digital Station
Circuit Pack and Auxiliary Equipment Leads (Pinout Charts)
Connect Remotely to the DEFINITY ECS Through a Data Module
digital line circuit protectors
Digital Out-of-Building Voice Terminal Protection
DIP switch locations, data module
Data Module Option Switch Settings
DIP switch settings, 7400B+ data module
Set the 7400B+ Data Module Options
DIP switch settings, U S Robotics modem
Connect Remotely to the DEFINITY ECS Through a Modem
testing queue warning indicator
direct PC connection to DEFINITY ECS
Connect Directly to the DEFINITY ECS
distributed communications system. See DCS.
Assign Server and Domain Names
DS1 Converter Complex Administration for T1 TN1654 Circuit Packs
Dupicated DS1 Converter Complex Administration for T1 TN1654 Circuit Packs
DS1 Converter Complex Administration for E1 TN1654 Circuit Packs
Duplicated DS1 Converter Complex Administration for E1 TN1654 Circuit Packs
Add TN1654 DS1 Converter (R10r Only)
Duplicated DS1C Converter Complex Administration for TN574 Circuit Packs
Set Circuit Pack Switches (TN1654 DS1 Converter)
Installing TN1654s in a Port Carrier
Installing TN1654s in a Switch Node Carrier
Connecting a Port Carrier to a Switch Node Carrier (TN1654 DS1 Converter)
Mounting the 127A (TN1654 DS1 Converter)
Wiring Off-Premises Stations (TN1654 DS1 Converter)
Add TN1654 DS1 Converter (R10r Only)
Set Circuit Pack Switches (TN1654 DS1 Converter)
Installing TN1654s in a Port Carrier
Installing TN1654s in a Switch Node Carrier
Connecting a Port Carrier to a Switch Node Carrier (TN1654 DS1 Converter)
Mounting the 127A (TN1654 DS1 Converter)
Wiring Off-Premises Stations (TN1654 DS1 Converter)
Connecting Through a Channel Service Unit
Circuit Pack and Auxiliary Equipment Leads (Pinout Charts)
Upgrading from a TN722 to a TN767C
Save Translations (DS1 Tie and OPS Trunks)
Power Down System (DS1 Tie and OPS Trunks)
Install Cables (DS1 Tie and OPS Trunks)
Resolve Alarms (DS1 Tie and OPS Trunks)
DS1C Converter Complex Administration for TN574 Circuit Packs
Install fiber optic cable for duplicated SCC systems
duplicated SPE interchange, testing
Test Duplicated Switch Processing Element Interchange (if duplicated)
Enable Duplication and Boot Critical Reliability System (R10r)
E
Install Rear Ground Plates (Systems with Earthquake Protection)
Install Front Ground Plates (Systems with Radiation Shielding and Earthquake Protection)
Install Earthquake Protection for SCC
Administer TN464GP/TN2464BP with Echo Cancellation
Administer TN464GP/TN2464BP with Echo Cancellation
Call Detail Recording Option Settings
Call Detail Recording Option Settings
Install Front Ground Plates (Systems with Radiation Shielding and Earthquake Protection)
Electronic Industries Association
Call Detail Recording Option Settings
emergency transfer panel, installing
Install the 808A Emergency Transfer panel
Install Telephones Used Only for Emergency Transfer (Trunk/Auxiliary Field)
Install Telephones Used for Emergency Transfer and as Normal Extension (Trunk/Auxiliary Field)
Emergency Transfer Units and Associated Telephones
Expansion Port Network (All Reliability Options)
expansion interface exchange, testing
Test Expansion Interface Exchange for Each Expansion Port Network
TestTime Division Multiplexing Bus for Each Expansion Port Network
tone clock interchange, testing
Test Tone-Clock Interchange for Each Expansion Port Network
Test Tone-Clock for Each Expansion Port Network
Position the Cabinets (Standard Reliability)
Position Cabinets (High or Critical Reliability)
Add U.S. Robotics Model USR 33.6 EXT External Modem to EPN
equipment room, station circuit distribution from
Station Circuit Distribution from Equipment Room
expanded power distribution unit
Install the Expanded Power Distribution Unit
expansion interface circuit packs, testing
Test Expansion Interface Circuit Packs
expansion interface exchange, testing
Test Expansion Interface Exchange for Each Expansion Port Network
expansion links, service state
Check System Status for Each Cabinet
external alarm indicators, connecting
Connect External Alarm Indicators and Auxiliary Power
Connect an Analog Station or 2-Wire Digital Station
Connect Power Distribution Unit External Alarm Wires
External Modem Option Settings
F
Changing the Feature Access Code
Fiber Link Administration form
Administering Fiber Optic Cables for R10r
DS1 Converter Complex Administration for T1 TN1654 Circuit Packs
Dupicated DS1 Converter Complex Administration for T1 TN1654 Circuit Packs
DS1 Converter Complex Administration for E1 TN1654 Circuit Packs
Duplicated DS1 Converter Complex Administration for E1 TN1654 Circuit Packs
DS1C Converter Complex Administration for TN574 Circuit Packs
duplication administration fields
Duplicated Fiber Link Administration
Administering Fiber Optic Cables for R10r
Fiber Link Administration form
Administering Fiber Optic Cables for R10r
Install Fiber Optic Cable Pass-Thru Kit (Single-Carrier Cabinets)
fiber optic cable pass-thru kit
Install Fiber Optic Cable Pass-Thru Kit (Single-Carrier Cabinets)
Connecting and Handling Fiber Optic Cables
Connecting and Handling Fiber Optic Cables
Install the Fiber-optic Cable with the Pass-thru Kit
Install fiber optic cable for duplicated SCC systems
Downloading Firmware to Port Circuit Packs
Install Translation Flash Memory Card (R10si)
Personal Communications Manager
Connect DC Battery Cabinet Frame Ground
Install Front Ground Plates (Systems with Radiation Shielding and Earthquake Protection)
Adding CO, FX, WATS, and PCOL Trunks
G
Connect DC Power Distribution Unit Ground
Connect DC Battery Cabinet Frame Ground
Install Rear Ground Plates (Systems with Earthquake Protection)
Install Front Ground Plates (Systems with Radiation Shielding and Earthquake Protection)
Connect DC Power Cabinet Ground
Ground and Connect AC-Powered Cabinets
H
Connecting and Handling Fiber Optic Cables
Main Distribution Frame (MDF) Hardware
High or Critical Reliability PPN - Two Cabinet Stack
High or Critical Reliability PPN - Three Cabinet Stack
high-reliability systems, cabling
Circuit Pack and Auxiliary Equipment Leads (Pinout Charts)
I
About Installing an ICSU Module
About Installing an ICSU Module
About Installing an ICSU Module
Register the Switch for Maintenance
information outlets, wiring design
Initialization and Administration System. See INADS.
installing cable slack manager
installing cables between auxiliary cabinet and MDF
Install Connector Cables Between Auxiliary Cabinet and MDF
installing cables between cabinet and MDF
Install Cables Between Cabinet and MDF
installing earthquake protection, SCC
Install Earthquake Protection for SCC
Position the Cabinets (Standard Reliability)
Position Cabinets (High or Critical Reliability)
Install fiber optic cable for duplicated SCC systems
Install Fiber Optic Cable Pass-Thru Kit (Single-Carrier Cabinets)
Install the Fiber-optic Cable with the Pass-thru Kit
installing patch cords and jumpers
Patch Cord/Jumper Installation and Administration
Position the Cabinets (Standard Reliability)
Position Cabinets (High or Critical Reliability)
installing system access software
integrated channel service unit
About Installing an ICSU Module
Connect Time Division Multiplexing Bus Cables
internet telephony server. See ITS.
Test the External Connection to the LAN
administering Media Processor mode
IP interface (TN802B), installing in IP trunk mode
Connect the Monitor, Keyboard, and Mouse
Log onto the TN802B Interface Server
Change Mu-Law to A-Law (for systems using A-Law companding only)
Test the External Connection to the LAN
IP interface (TN802B), installing in MedPro mode
Installing a TN802B in Media Processor Mode
Test the External Connection to the LAN
IP interface (TN802B), upgrading to TN2302AP IP Media Processor
Upgrading a TN802B IP Interface Assembly to TN2302AP IP Media Processor
Installing a TN802B in IP Trunk Mode
test external connection to LAN
Test the External Connection to the LAN
Test the IP Interface Onboard LAN Connections
Test the IP Interface Onboard LAN Connections
Perform Initial Administration Steps for C-LAN and IP Media Processor
Installing a TN2302AP IP Media Processor
Installing the TN2302AP IP Media Processor
Preparing for Installation and Upgrade
test external connection to LAN
Test the External Connection to the LAN
IP Media Processor, connecting
Test the External Connection to the LAN
IP Media Processor, installing
IP Media Processor, upgrading from IP interface assembly
Upgrading a TN802B IP Interface Assembly to TN2302AP IP Media Processor
IP Media Processor, upgrading to
Perform Pre-upgrade Administration
IP network connection, testing
Avaya R300 Remote Office Communicator
Installing a TN802B in IP Trunk Mode
Change Mu-Law to A-Law (for systems using A-Law companding only)
Connect the Monitor, Keyboard, and Mouse
Log onto the TN802B Interface Server
Change Mu-Law to A-Law (for systems using A-Law companding only)
Test the External Connection to the LAN
Install and Administer ISDN - BRI
fanout of multipoint installations
Installing Multipoint Adapters
Installing Multipoint Adapters
BRI Terminating Resistor Installation
Circuit Pack and Auxiliary Equipment Leads (Pinout Charts)
Installing ISDN - PRI Internationally
Enter Added Translations (ISDN PRI)
Digital Out-of-Building Voice Terminal Protection
ITW Linx enhanced protector, installing
Digital Out-of-Building Voice Terminal Protection
J
J58890CG DC power distribution unit
Position the Cabinets (Standard Reliability)
Position Cabinets (High or Critical Reliability)
Position the Cabinets (Standard Reliability)
Position Cabinets (High or Critical Reliability)
Position Cabinets (High or Critical Reliability)
J58890N expansion control cabinet
Position the Cabinets (Standard Reliability)
Position Cabinets (High or Critical Reliability)
Ground and Connect AC-Powered Cabinets
Verify Port Cabinet Address Plugs
jumper wires, connecting trunk pairs
Connect Trunk Pairs to Cabinet Using Jumper Wires To Establish 3-Pair Modularity
jumpers, installing and administering
Patch Cord/Jumper Installation and Administration
L
labels, equipment room cabling
Main Distribution Frame Labels
Test the External Connection to the LAN
Test the External Connection to the LAN
Connecting and Handling Fiber Optic Cables
lead and color designations, pinouts
port circuit packs and telephones
Connect an Analog Station or 2-Wire Digital Station
Connect Power Distribution Unit External Alarm Wires
Test Stratum 3 Clock (if used)
Reset LEDs on Power Distribution Unit
Deliver or install the License File
Deliver License File (CallVisor ASAI)
Deliver or install the License File (Packet Bus Support)
Deliver License File (Add DCS)
Deliver or Install License file (DS1 Tie and OPS Trunks)
License Installation Tool (LIT)
Deliver or install the License File
Deliver License File (CallVisor ASAI)
Deliver or install the License File (Packet Bus Support)
Deliver License File (Add DCS)
Deliver or Install License file (DS1 Tie and OPS Trunks)
light emitting diodes. See LEDs.
10A Lightguide Connector Panel and Couplings
lightguide interconnect unit. See LIU.
Connecting and Handling Fiber Optic Cables
Optical Cross-Connect Hardware
100A Lightguide Interconnect Unit
10A Lightguide Connector Panel and Couplings
M
Main Distribution Frame. See MDF
Add Cabinet 2 through N (R10r)
reboot high reliability system
Reboot High Reliability System (MCC only)
Connect Power Distribution Unit External Alarm Wires
emergency transfer connections
Install the 808A Emergency Transfer panel
Emergency Transfer Units and Associated Telephones
Install Off-Premises Station Wiring
MDF connections, multicarrier cabinet
Main Distribution Frame (MDF) Hardware
MDF connections, single-carrier cabinet
Main Distribution Frame (MDF) Hardware
Main Distribution Frame (MDF) Hardware
Main Distribution Frame Labels
MDF, cabling to auxiliary cabinet
Install Connector Cables Between Auxiliary Cabinet and MDF
Install Cables Between Cabinet and MDF
Installing a TN802B in Media Processor Mode
Test the External Connection to the LAN
Circuit Pack and Auxiliary Equipment Leads (Pinout Charts)
External Modem Option Settings
Connect Modem to Telephone Network
Set the Modem Connected to Data Module
Set the Modem Connected to the Data Terminal Equipment (DTE)
Connect Modem to Telephone Network
modem connection to DEFINITY ECS
Connect Remotely to the DEFINITY ECS Through a Modem
Set 7400A and 7400B Options (Modem Pooling)
Add U.S. Robotics Model USR 33.6 EXT External Modem to EPN
Add U.S. Robotics Model USR 33.6 EXT External Modem to PPN
Set 7400A and 7400B Options (Modem Pooling)
External Modem Option Settings
modem, external, switch settings
modems, installing and connecting
Three-Pair and Four-Pair Modularity
Mount 110A- or 110P-type terminal blocks on the wall
Mount 110P-type terminal blocks on a frame
multimode fiber optic transceiver
multiple announcements, adding
Add additional TN750C Circuit Packs
Installing Multipoint Adapters
Installing Multipoint Adapters
N
Ground and Connect AC-Powered Cabinets
Connect Modem to Telephone Network
O
off-premises digital line circuit protectors
Digital Out-of-Building Voice Terminal Protection
Off-Premises Protection Requirements
Digital Out-of-Building Voice Terminal Protection
Install Off-Premises Station Wiring
Off-Premises or Out-of-Building Stations
Wiring Off-Premises Stations (TN1654 DS1 Converter)
onboard LAN connections, testing
Test the IP Interface Onboard LAN Connections
Upgrading from a TN722 to a TN767C
Save Translations (DS1 Tie and OPS Trunks)
Power Down System (DS1 Tie and OPS Trunks)
Install Cables (DS1 Tie and OPS Trunks)
Resolve Alarms (DS1 Tie and OPS Trunks)
10A Lightguide Connector Panel and Couplings
Optical Cross-Connect Hardware
Set 7400A and 7400B Options (Modem Pooling)
Data Module Option Switch Settings
AUDIX Interface Option Settings
Off-Premises or Out-of-Building Stations
outputs cable for control carrier
P
Add Packet Bus Support (ISDN PRI)
Add Packet Bus Support for R10si
Disable Alarm Origination (Packet Bus Support)
Power Up System (Packet Bus Support)
Test the Packet Bus and C-LAN Circuit Pack (Packet Bus Support)
Circuit Pack and Auxiliary Equipment Leads (Pinout Charts)
Install Fiber Optic Cable Pass-Thru Kit (Single-Carrier Cabinets)
patch cords, installing and administering
Patch Cord/Jumper Installation and Administration
Adding CO, FX, WATS, and PCOL Trunks
Connector and Cable Diagrams (Pinout Charts)
Connector and Cable Diagrams (Pinout Charts)
port circuit packs and telephones
Connect an Analog Station or 2-Wire Digital Station
Connect Power Distribution Unit External Alarm Wires
Connector and Cable Diagrams (Pinout Charts)
port circuit packs and telephones
Circuit Pack and Auxiliary Equipment Leads (Pinout Charts)
Circuit Pack and Auxiliary Equipment Leads (Pinout Charts)
Connector and Cable Diagrams (Pinout Charts)
Connector and Cable Diagrams (Pinout Charts)
TN2185B ISDN-BRI 4-wire S Interface
TN2198 ISDN-BRI 2-wire U Interface
TN793B 24-Port Analog Line circuit pack
playback announcement, testing
PNC duplication administration fields
Duplicated Fiber Link Administration
Patch Cord/Jumper Installation and Administration
Verify Port Cabinet Address Plugs
port circuit pack pin designations
Connect an Analog Station or 2-Wire Digital Station
Connect Power Distribution Unit External Alarm Wires
Port Network Connectivity. See PNC.
Install and Position Stratum 3 Clock Cabinet
Connect Power Distribution Unit External Alarm Wires
Reset LEDs on Power Distribution Unit
DEFINITY AUDIX System Power Procedures
Position the Cabinets (Standard Reliability)
Position Cabinets (High or Critical Reliability)
Power Up and Test the Power Supply
1151A1 and 1151A2 Power Supplies
1151A1 and 1151A2 Power Supplies
DEFINITY AUDIX System Power Procedures
Test Time Division Multiplexing Bus in Processor Port Network
Position the Cabinets (Standard Reliability)
Position Cabinets (High or Critical Reliability)
Add U.S. Robotics Model USR 33.6 EXT External Modem to PPN
Installing ISDN - PRI Internationally
Enter Added Translations (ISDN PRI)
Off-Premises Protection Requirements
Digital Out-of-Building Voice Terminal Protection
processing element interchange, testing
Test Duplication Option Processing Element Interchange
Downloading Firmware to Port Circuit Packs
Downloading Firmware to Port Circuit Packs
Downloading Firmware to Port Circuit Packs
Downloading Firmware to Port Circuit Packs
Downloading Firmware to Port Circuit Packs
Install Front Ground Plates (Systems with Radiation Shielding and Earthquake Protection)
Q
Install the Queue Warning Indicator
queue warning indicator, testing
R
rebooting critical reliability systems
Enable Duplication and Boot Critical Reliability System (R10r)
recorded announcement, testing
Register the Switch for Maintenance
Install the Remote Network Interface
remote PC connection to DEFINITY ECS
Connect Remotely to the DEFINITY ECS Through a Data Module
Connect Remotely to the DEFINITY ECS Through a Modem
Install Removable Media (R10r in MCC)
reporting circuit pack damage or discrepancies
Install Front Ground Plates (Systems with Radiation Shielding and Earthquake Protection)
S
Important Warning for 1145B Power Supply
1151A1 and 1151A2 power supply
Important Safety Instructions for 1151A1 and 1151A2 Power Supplies
Save Translations (CallVisor ASAI)
Save Translations (Packet Bus Support)
Save Translations (Packet Bus Support)
Save Translations (DS1 Tie and OPS Trunks)
Save Translations (DS1 Tie and OPS Trunks)
Connect Optional Battery Leads
Install Earthquake Protection for SCC
Install the Fiber-optic Cable with the Pass-thru Kit
Install fiber optic cable for duplicated SCC systems
Install Fiber Optic Cable Pass-Thru Kit (Single-Carrier Cabinets)
test fiber optic cable installation
SCC control cabinet, connecting to DC power cabinet
Connect Single-Carrier Cabinet Ground
Administration Screens and Commands
Install the 26B1 Selector Console
Assign Server and Domain Names
Check System Status for Each Cabinet
setting 7400B+ data module options
Set the 7400B+ Data Module Options
setting data module operating mode
Set the Data Module Operating Mode
setting data module to DCE mode
Set the Data Module to DCE Mode
setting daylight savings rules
Test SPE Duplication Memory Shadowing Link (if duplicated)
Install Front Ground Plates (Systems with Radiation Shielding and Earthquake Protection)
TN760D Tie Trunk Circuit Pack Option Settings
sneak current protection, installing
Off-Premises Protection Requirements
Digital Out-of-Building Voice Terminal Protection
sneak fuse panel, space requirements
Installation Space Requirements
Installation Space Requirements
Installation Space Requirements
Installation Space Requirements
Installation Space Requirements
SPE duplication memory shadowing, testing
Test SPE Duplication Memory Shadowing Link (if duplicated)
Test Duplicated Switch Processing Element Interchange (if duplicated)
stabilizing cabinets for earthquake protection
Install Rear Ground Plates (Systems with Earthquake Protection)
Install Front Ground Plates (Systems with Radiation Shielding and Earthquake Protection)
Standard Reliability PPN - One Cabinet Stack
standard-reliability systems, cabling
Station Circuit Distribution from Equipment Room
Install Removable Media (R10r in MCC)
Install Translation Flash Memory Card (R10si)
Install and Position Stratum 3 Clock Cabinet
Check and Connect Commercial AC Power
Connect DC Power and Ground to Stratum 3 Clock Cabinet
Connect Stratum 3 Clock DC Power
Install the Stratum 3 Clock Wiring
Install the Stratum 3 Clock Wiring
Connect Clock Cabinet Grounding
Installing the Stratum 3 Clock
Test Stratum 3 Clock (if used)
Install the Stratum 3 Clock Wiring
Install the Stratum 3 Clock Wiring
Stratum 3 clock, administering
Stratum 3 clock, connecting AC power
Connect AC Power to Stratum 3 Clock Cabinet
Unpack and Inspect Stratum 3 Clock Cabinet
Test Stratum 3 Clock (if used)
Set 7400A and 7400B Options (Modem Pooling)
Call Detail Recording Option Settings
Data Module Option Switch Settings
AUDIX Interface Option Settings
Data Module Option Switch Settings
External Modem Option Settings
TN760D Tie Trunk Circuit Pack Option Settings
Check System Status for Each Cabinet
Set System Maintenance Parameters
T
Check System Status for Each Cabinet
Connect Time Division Multiplexing Bus Cables
Standard Reliability PPN - One Cabinet Stack
High or Critical Reliability PPN - Two Cabinet Stack
High or Critical Reliability PPN - Three Cabinet Stack
Expansion Port Network (All Reliability Options)
Standard Reliability PPN - One Cabinet Stack
High or Critical Reliability PPN - Two Cabinet Stack
High or Critical Reliability PPN - Three Cabinet Stack
Expansion Port Network (All Reliability Options)
Test Time Division Multiplexing Bus in Processor Port Network
TestTime Division Multiplexing Bus for Each Expansion Port Network
Connect an Analog Station or 2-Wire Digital Station
Connect Power Distribution Unit External Alarm Wires
Install Telephones Used Only for Emergency Transfer (Trunk/Auxiliary Field)
Install Telephones Used for Emergency Transfer and as Normal Extension (Trunk/Auxiliary Field)
Test Telephones and Other Equipment
terminal blocks, frame-mounting
Mount 110P-type terminal blocks on a frame
terminal blocks, wall-mounting
Mount 110A- or 110P-type terminal blocks on the wall
Station Circuit Distribution from Equipment Room
BRI Terminating Resistor Installation
terminating trunk transmission test types
Test Terminating Trunk Transmission
Standard Reliability PPN - One Cabinet Stack
High or Critical Reliability PPN - Two Cabinet Stack
High or Critical Reliability PPN - Three Cabinet Stack
Expansion Port Network (All Reliability Options)
Test Telephones and Other Equipment
Test Telephones and Other Equipment
test external connection to LAN
Test the External Connection to the LAN (Add DCS)
Test the External Connection to the LAN
Test the External Connection to the LAN
Test the External Connection to the LAN
Test the External Connection to the LAN
test types, terminating trunk transmission
Test Terminating Trunk Transmission
testing data module hardware connections
Test Data Module Hardware Connections
TN760D Tie Trunk Circuit Pack Option Settings
Circuit Pack and Auxiliary Equipment Leads (Pinout Charts)
time division multiplexor. See TDM.
Add TN1654 DS1 Converter (R10r Only)
TN1654 DS1 converter circuit packs
DS1 Converter Complex Administration for T1 TN1654 Circuit Packs
DS1 Converter Complex Administration for E1 TN1654 Circuit Packs
Duplicated DS1 Converter Complex Administration for E1 TN1654 Circuit Packs
TN1654 DS1 converter circuit packs, duplicated
Dupicated DS1 Converter Complex Administration for T1 TN1654 Circuit Packs
TN2185B ISDN-BRI 4-wire S Interface
TN2198 ISDN-BRI 2-wire U Interface
Installing a TN2302AP IP Media Processor
Installing the TN2302AP IP Media Processor
Preparing for Installation and Upgrade
Perform Initial Administration Steps for C-LAN and IP Media Processor
TN2302AP circuit pack, upgrading to
TN2302AP, upgrading from TN802B IP interface assembly
Upgrading a TN802B IP Interface Assembly to TN2302AP IP Media Processor
Administer TN464GP/TN2464BP with Echo Cancellation
TN2501AP (integrated announcements)
faceplate LEDs and interpretation
Installing the TN2501AP circuit pack
Administer TN464GP/TN2464BP with Echo Cancellation
TN574 DS1 converter circuit packs
DS1C Converter Complex Administration for TN574 Circuit Packs
TN574 DS1 converter complex circuit packs
Duplicated DS1C Converter Complex Administration for TN574 Circuit Packs
Move a Single Announcement from one Announcement Circuit Pack to another
Replace a TN750 or TN750B with a TN750C or Move all Announcements from a TN750B to a TN750C
Add additional TN750C Circuit Packs
TN760D Tie Trunk Circuit Pack Option Settings
TN793B 24-Port Analog Line circuit pack
Perform Initial Administration Steps for C-LAN and IP Media Processor
Downloading Firmware to Port Circuit Packs
test external connection to LAN
Test the External Connection to the LAN
Test the IP Interface Onboard LAN Connections
Change Mu-Law to A-Law (for systems using A-Law companding only)
test external connection to LAN
Test the External Connection to the LAN
TN802B circuit pack, testing external LAN connection
Test the External Connection to the LAN
TN802B IP interface, upgrading to
Upgrading a TN802 V3 (or later) to a TN802B (MedPro Mode)
Connect the Monitor, Keyboard, and Mouse
TN802B, installing in IP trunk mode
Connect the Monitor, Keyboard, and Mouse
Log onto the TN802B Interface Server
Change Mu-Law to A-Law (for systems using A-Law companding only)
Test the External Connection to the LAN
TN802B, installing in MedPro mode
Installing a TN802B in Media Processor Mode
Test the External Connection to the LAN
tone clock interchange, testing
Test Tone-Clock Interchange for Each Expansion Port Network
Check System Status for Each Cabinet
Test Tone-Clock for Each Expansion Port Network
trunk pairs, connecting with concentrator cables
Connect Trunk Pairs Using Concentrator Cables
trunk pairs, connecting with jumper wires
Connect Trunk Pairs to Cabinet Using Jumper Wires To Establish 3-Pair Modularity
Test Terminating Trunk Transmission
Changing the Feature Access Code
Changing the ARS Digit Analysis
Changing the CAMA Numbering and Class of Restriction
Adding CO, FX, WATS, and PCOL Trunks
Upgrading from a TN722 to a TN767C
Save Translations (DS1 Tie and OPS Trunks)
Power Down System (DS1 Tie and OPS Trunks)
Install Cables (DS1 Tie and OPS Trunks)
Resolve Alarms (DS1 Tie and OPS Trunks)
Adding CO, FX, WATS, and PCOL Trunks
Installing ISDN - PRI Internationally
Enter Added Translations (ISDN PRI)
Upgrading from a TN722 to a TN767C
Save Translations (DS1 Tie and OPS Trunks)
Power Down System (DS1 Tie and OPS Trunks)
Install Cables (DS1 Tie and OPS Trunks)
Resolve Alarms (DS1 Tie and OPS Trunks)
Adding CO, FX, WATS, and PCOL Trunks
Adding TTC Japanese 2-Mbit Trunks
Adding CO, FX, WATS, and PCOL Trunks
Adding TTC Japanese 2-Mbit Trunks
U
U S Robotics modem DIP switch settings
Connect Remotely to the DEFINITY ECS Through a Modem
Add U.S. Robotics Model USR 33.6 EXT External Modem to EPN
Add U.S. Robotics Model USR 33.6 EXT External Modem to PPN
testing queue warning indicator
uninterrupted power supply. See UPS.
IP interface assembly to IP Media Processor
Upgrading a TN802B IP Interface Assembly to TN2302AP IP Media Processor
IP Trunking to IP Media Processor
Upgrading TN802 IP Trunking to TN2302AP IP Media Processor
Upgrade IP trunks (R7) to H.323 trunks
Upgrading from a TN722 to a TN767C
Upgrading a TN802 V3 (or later) to a TN802B (MedPro Mode)
Administer the External Device Alarm (EDA)
UPS Installation for SCC EPN A-Carrier Cabinet
UPS Installation for SCC EPN A-Carrier Cabinet
installing for SCC EPN cabinet
UPS Installation for SCC EPN A-Carrier Cabinet
UPS Installation for SCC EPN A-Carrier Cabinet
cross-connect field for AUX connector
Make the Remaining Connections
Make the Remaining Connections
Make the Remaining Connections
Add U.S. Robotics Model USR 33.6 EXT External Modem to EPN
Add U.S. Robotics Model USR 33.6 EXT External Modem to PPN
V
verifying system start-up messages
voice and data terminals, connectable
voice terminals, exposed environments
Voice Terminal Restrictions for Exposed Environments
W
Install the Wall-Mounting Plates
Adding CO, FX, WATS, and PCOL Trunks
Wire the 1146B Power Distribution Unit
Connect an Analog Station or 2-Wire Digital Station
Connect an Analog Station or 2-Wire Digital Station
Connect an Analog Station or 2-Wire Digital Station
Install the Battery Mounting/Wiring
Connect an Analog Station or 2-Wire Digital Station
Connect an Analog Station or 2-Wire Digital Station
Install Off-Premises Station Wiring
Wiring Off-Premises Stations (TN1654 DS1 Converter)
Connector and Cable Diagrams (Pinout Charts)
Install and Wire Telephone Power Supply
Z
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
Copyright� 2001 Avaya Inc. |
Send comments to MadeEasy Development Team |
Always check at the Made Easy Web site for the most current information. |