DEFINITY Made Easy Tools
Issue 3, December 2001
Contents
Installation for SCC Made Easy
Install and Connect Single-Carrier Cabinets
Position the Cabinets (Standard Reliability)
Position Cabinets (High or Critical Reliability)
Install Earthquake Protection for SCC
Connect DC Power Cabinet Ground
Connect DC Battery Cabinet Frame Ground
Connect DC Power Distribution Unit Ground
Connect Single-Carrier Cabinet Ground
Install on a wall without a plywood backing plate
Installing on a wall with a plywood backing plate
DC Power Connections with DC Distribution Unit
Connect AC Power to DC Power Cabinet
Connect Optional Battery Leads
Ground and Connect AC-Powered Cabinets
Connect the Power Cord into the Power Receptacle
Connect Time Division Multiplexing Bus Cables
Standard Reliability PPN - One Cabinet Stack
High or Critical Reliability PPN - Two Cabinet Stack
High or Critical Reliability PPN - Three Cabinet Stack
Expansion Port Network (All Reliability Options)
Verify Port Cabinet Address Plugs
Install Rear Ground Plates (Systems with Earthquake Protection)
Install Front Ground Plates (Systems with Radiation Shielding and Earthquake Protection)
Install Cabinet Clips (Systems without Earthquake Protection)
Install Telecommunications Cabling
Information about Installing the Cabling
Main Distribution Frame (MDF) Hardware
Main Distribution Frame Labels
Off-Premises Circuit Protection
Control Carrier Outputs Cable Installation
Trunk Cables Among Network Interface, Sneak Fuse Panel, and Cabinet
Installation Space Requirements
Sneak Fuse Panels and Emergency Transfer Units
Station Circuit Distribution from Equipment Room
3-Pair to 4-Pair Station Circuit Distribution
Connectable Administration Terminals
Site, Satellite, and Adapter Locations
Sizing 25-Pair and Multiple 25-Pair Station Cables
Patch Cord/Jumper Installation and Administration
Connect Control Carrier Outputs Cable
Connect Trunk Pairs Using Concentrator Cables
Connect Trunk Pairs to Cabinet Using Jumper Wires To Establish 3-Pair Modularity
Install Cables Between Cabinet and MDF
Install Connector Cables Between Auxiliary Cabinet and MDF
Mount 110A- or 110P-type terminal blocks on the wall
Mount 110P-type terminal blocks on a frame
Install Coupled Bonding Conductor
Information about Installing the Software, Administering the System, and Powering a DEFINITY AUDIX System
Administration Screens and Commands
Administering the Circuit Packs
Change Circuit Pack Form Implementation Notes
DEFINITY AUDIX System Power Procedures
Manually Power Down AUDIX System
Manually Power Up AUDIX System
Install and Use Avaya Site Administration
Connect Directly to the DEFINITY ECS
Connect Remotely to the DEFINITY ECS Through a Data Module
Connect Remotely to the DEFINITY ECS Through a Modem
Set the Data Module to DCE Mode
Add a Data Module to the Switch
Test Data Module Hardware Connections
Set the Data Module Operating Mode
Set the 7400B+ Data Module Options
Install Translation Flash Memory Card (R10si)
Install Removable Media (R10r in MCC)
Deliver or install the License File
Administer no-license/emergency numbers
Add Cabinet 2 through N (R10r)
Set System Maintenance Parameters
Reboot High Reliability System (MCC only)
Enable Duplication and Boot Critical Reliability System (R10r)
Register the Switch for Maintenance
DS1 Converter Circuit Pack LEDs
Check System Status for Each Cabinet
Check Circuit Pack Configuration
Test Time Division Multiplexing Bus in Processor Port Network
Test SPE Duplication Memory Shadowing Link (if duplicated)
Test Duplicated Switch Processing Element Interchange (if duplicated)
Test Expansion Interface Circuit Packs
TestTime Division Multiplexing Bus for Each Expansion Port Network
Test Tone-Clock for Each Expansion Port Network
Test Tone-Clock Interchange for Each Expansion Port Network
Test Expansion Interface Exchange for Each Expansion Port Network
Check Circuit Pack Configuration
Save Translations, if Required
Connectable Voice and Data Terminals
Connectable Administration Terminals
Connect an Analog Station or 2-Wire Digital Station
DS1 Tie Trunks Using T1 Channel Service Unit
Three-Pair and Four-Pair Modularity
Adjunct Power Connection Locations
Attendant Console Cabling Distances, Local and Phantom Power
Dual Wiring of Two-Wire and Four-Wire Endpoints
Install the 26B1 Selector Console
Connect External Alarm Indicators and Auxiliary Power
Connect Power Distribution Unit External Alarm Wires
Install the Remote Network Interface
Install Off-Premises Station Wiring
Off-Premises or Out-of-Building Stations
Off-Premises Protection Requirements
Voice Terminal Restrictions for Exposed Environments
Digital Out-of-Building Voice Terminal Protection
Installing the ITW Linx Enhanced Protector
Installing the 4C3S-75 Enhanced Protector
Installing the Data Link Protector
Emergency Transfer Units and Associated Telephones
808A Emergency Transfer Panel and Telephone Installation Examples
Install the 808A Emergency Transfer panel
Install Telephones Used Only for Emergency Transfer (Trunk/Auxiliary Field)
Install Telephones Used for Emergency Transfer and as Normal Extension (Trunk/Auxiliary Field)
Install the Queue Warning Indicator
Install and Wire Telephone Power Supply
Important Warning for 1145B Power Supply
Install the Wall-Mounting Plates
Mount the 1146B Power Distribution Unit
Install the Battery Mounting/Wiring
Install the Expanded Power Distribution Unit
Power Up and Test the Power Supply
Wire the 1146B Power Distribution Unit
Reset LEDs on Power Distribution Unit
1151A1 and 1151A2 Power Supplies
Using 1151A1 and 1151A2 Power Supplies
Important Safety Instructions for 1151A1 and 1151A2 Power Supplies
Connect the 1151A1 or 1151A2 Power Supplies
DEFINITY Wireless Business System
Circuit Pack and Auxiliary Equipment Classifications
Install and Administer ISDN - BRI
BRI Terminating Resistor Installation
Important Warning for Telephone Wiring
Terminating Resistor Adapter and Block
Installing Multipoint Adapters
Basic Multipoint Installation Distances
Enter Added Translations (ISDN BRI)
Add a TN2501AP Announcement Circuit Pack
Verifying the required hardware
Installing the TN2501AP circuit pack
Configuring the system for the TN2501AP
TN750C Announcement Circuit Pack
TN2501AP Announcement Circuit Pack
Save and Restore Recorded Announcements
TN750 and TN750B Announcement Circuit Packs
Replace a TN750 or TN750B with a TN750C or Move all Announcements from a TN750B to a TN750C
Add additional TN750C Circuit Packs
Move a Single Announcement from one Announcement Circuit Pack to another
Deliver License File (CallVisor ASAI)
Save Translations (CallVisor ASAI)
Add Circuit Packs (CallVisor ASAI)
Install Cables (CallVisor ASAI)
Enter Added Translations (CallVisor ASAI)
Resolve Alarms (CallVisor ASAI)
Save Translations (CallVisor ASAI)
Add Packet Bus Support for R10si
Disable Alarm Origination (Packet Bus Support)
Save Translations (Packet Bus Support)
Power Down Cabinet (Packet Bus Support)
Install Circuit Packs (Packet Bus Support)
Power Up System (Packet Bus Support)
Deliver or install the License File (Packet Bus Support)
Test the Packet Bus and C-LAN Circuit Pack (Packet Bus Support)
Resolve Alarms (Packet Bus Support)
Enable Scheduled Maintenance and Alarm Notification (Packet Bus Support)
Save Translations (Packet Bus Support)
Test the External Connection to the LAN (Add DCS)
Deliver License File (Add DCS)
Administer TN464GP/TN2464BP with Echo Cancellation
Installing a TN2302AP IP Media Processor
Preparing for Installation and Upgrade
Installing the TN2302AP IP Media Processor
Connect the cables for TN2302AP
Perform Initial Administration Steps for C-LAN and IP Media Processor
Test the External Connection to the LAN
Upgrading TN802 IP Trunking to TN2302AP IP Media Processor
Perform Pre-upgrade Administration
Upgrading a TN802B IP Interface Assembly to TN2302AP IP Media Processor
Perform Pre-upgrade Administration
Perform Additional Administration Steps
Installing a TN802B in Media Processor Mode
Test the External Connection to the LAN
Installing a TN802B in IP Trunk Mode
Connect the Monitor, Keyboard, and Mouse
Log onto the TN802B Interface Server
Change Mu-Law to A-Law (for systems using A-Law companding only)
Assign Server and Domain Names
Test the External Connection to the LAN
Test the IP Interface Onboard LAN Connections
Upgrading a TN802 V3 (or later) to a TN802B (MedPro Mode)
Connect the Monitor, Keyboard, and Mouse
Upgrade IP trunks (R7) to H.323 trunks
About Installing an ICSU Module
H700-383-Equivalent Cable Guidelines
Installing a 3150/3170 Channel Service Unit
Changing the Feature Access Code
Changing the ARS Digit Analysis
Changing the CAMA Numbering and Class of Restriction
Installing ISDN - PRI in North American
Installing ISDN - PRI Internationally
Add Packet Bus Support (ISDN PRI)
Enter Added Translations (ISDN PRI)
Adding CO, FX, WATS, and PCOL Trunks
Upgrading from a TN722 to a TN767C
Disable Scheduled Maintenance and Alarm Origination to INADS (DS1 Tie and OPS Trunks)
Save Translations (DS1 Tie and OPS Trunks)
Shut Down DEFINITY LAN Gateway System (DS1 Tie and OPS Trunks)
Shut Down DEFINITY AUDIX System (DS1 Tie and OPS Trunks)
Power Down System (DS1 Tie and OPS Trunks)
Add Circuit Packs (DS1 Tie and OPS Trunks)
Install Cables (DS1 Tie and OPS Trunks)
Power Up System (DS1 Tie and OPS Trunks)
Enter Added Translations (DS1 Tie and OPS Trunks)
Save Translations (DS1 Tie and OPS Trunks)
Resolve Alarms (DS1 Tie and OPS Trunks)
Deliver or Install License file (DS1 Tie and OPS Trunks)
Adding TTC Japanese 2-Mbit Trunks
Add TN1654 DS1 Converter (R10r Only)
Circuit Pack and Cabling (T1 Only)
Set Circuit Pack Switches (TN1654 DS1 Converter)
Installing TN1654s in a Port Carrier
Installing TN1654s in a Switch Node Carrier
Connecting a Port Carrier to a Switch Node Carrier (TN1654 DS1 Converter)
Connecting Through a Channel Service Unit
Mounting the 127A (TN1654 DS1 Converter)
Wiring Off-Premises Stations (TN1654 DS1 Converter)
Installing the Stratum 3 Clock
Unpack and Inspect Stratum 3 Clock Cabinet
Install and Position Stratum 3 Clock Cabinet
Connect AC Power to Stratum 3 Clock Cabinet
Check and Connect Commercial AC Power
Connect DC Power and Ground to Stratum 3 Clock Cabinet
Connect Clock Cabinet Grounding
Connect Stratum 3 Clock DC Power
Install the Stratum 3 Clock Wiring
Connect Modem to Telephone Network
Add U.S. Robotics Model USR 33.6 EXT External Modem to EPN
Add U.S. Robotics Model USR 33.6 EXT External Modem to PPN
Add Pooled Modem (Paradyne 3800 Series)
Set the Modem Connected to Data Module
Set the Modem Connected to the Data Terminal Equipment (DTE)
Set 7400A and 7400B Options (Modem Pooling)
Downloading Firmware to Port Circuit Packs
Download image from support Web site
Set up file system on source board
Copy image from a PC to source board
Copy image from source board to target board
Verify Trunk Status (optional)
Check Specified Resources (scheduled downloads only)
Using an FTP program through MS-DOS or UNIX
Test Telephones and Other Equipment
Test Duplication Option Processing Element Interchange
Test Terminating Trunk Transmission
Test Stratum 3 Clock (if used)
Activate and Test Alarm Origination Feature
Data Module Option Switch Settings
About 7400D Data Module Option Settings
External Modem Option Settings
Call Detail Recording Option Settings
AUDIX Interface Option Settings
TN760D Tie Trunk Circuit Pack Option Settings
Connecting and Handling Fiber Optic Cables
Optical Cross-Connect Hardware
100A Lightguide Interconnect Unit
10A Lightguide Connector Panel and Couplings
Install Fiber Optic Cable Pass-Thru Kit (Single-Carrier Cabinets)
Install the Fiber-optic Cable with the Pass-thru Kit
Install fiber optic cable for duplicated SCC systems
Administering Fiber Optic Cables for R10r
Fiber Link Administration Form
Duplicated Fiber Link Administration
DS1C Converter Complex Administration for TN574 Circuit Packs
Duplicated DS1C Converter Complex Administration for TN574 Circuit Packs
DS1 Converter Complex Administration for T1 TN1654 Circuit Packs
Dupicated DS1 Converter Complex Administration for T1 TN1654 Circuit Packs
DS1 Converter Complex Administration for E1 TN1654 Circuit Packs
Duplicated DS1 Converter Complex Administration for E1 TN1654 Circuit Packs
Connector and Cable Diagrams (Pinout Charts)
Circuit Pack and Auxiliary Equipment Leads (Pinout Charts)
Circuit Pack and Auxiliary Equipment Leads (Pinout Charts)
TN2185B ISDN-BRI 4-wire S Interface
TN2198 ISDN-BRI 2-wire U Interface
TN793B 24-Port Analog Line circuit pack
UPS Installation for SCC EPN A-Carrier Cabinet
Make the Remaining Connections
Administer the External Device Alarm (EDA)
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |