DEFINITY Made Easy Tools
Issue 3, December 2001
System 75 Small-Cabinet to R8si (Blowback)
Run acceptance tests [75 small upgrade]
Run any acceptance tests that are appropriate for this upgrade. The acceptance tests are listed in these 3 checklists:
Test single-carrier cabinet systems
Test multi-carrier cabinet systems
Test telephones and other equipment
Test Telephones and other Equipment
Test single-carrier cabinet systems
Check System Status for Each Cabinet
Check Circuit Pack Configuration
Test Time Division Multiplexing Bus in Processor Port Network
Test Expansion Interface Circuit Packs
Test Time Division Multiplexing Bus for Each Expansion Port Network
Test Tone-Clock for Each Expansion Port Network
Test Tone-Clock Interchange for Each Expansion Port Network
Test Expansion Interface Exchange for Each Expansion Port Network
Check Circuit Pack Configuration
Save Translations, if Required
Test multi-carrier cabinet systems
Check System Status for Each Cabinet
Check Circuit Pack Configuration
Test SPE Duplication Memory Shadowing Link
Test Duplicated Switch Processing
Test Expansion Interface Circuit Packs
Test Tone-Clock Interchange for each EPN
Test Expansion Interface Exchange for Each EPN
Check Circuit Pack Configuration Again
Test telephones and other equipment
Test Duplication Option Processing
Test Terminating Trunk Transmission
Activate and Test Alarm Origination Feature
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |