DEFINITY Made Easy Home Page Table of contents Previous page Next page Index Links Frequently asked questions
Go to Upgrades for R9 Go to Installation for MCC Go to Installation for SCC



Tape Drive: Lock the active SPE (High/Critical reliability only) [R9r]

Return to Task List


Note: Replace the circuit packs in the standby control carrier first.


Caution! Electrostatic discharge can severely damage sensitive electronic circuits. Before handling any electronic hardware, be sure to wear a grounding wrist strap or other static-dissipating device.

  1. Type status spe and press Enter to determine which control carrier is active, or observe the control carrier LEDs.

  2. Move the SPE-SELECT switches on both Duplication Interface (DUPINT) circuit packs, one at a time, to the active carrier.

Return to Task List


DEFINITY Made Easy Home Page Table of contents Previous page Next page Index Links Frequently asked questions
Go to Upgrades for R9 Go to Installation for MCC Go to Installation for SCC
Copyright 2000 Avaya Inc
Send comments to MadeEasy Development Team



Always check at the Made Easy Web site for the most current information.