DEFINITY Made Easy Home Page Table of contents Previous page Next page Index Links Frequently asked questions
Go to Upgrades for R9 Go to Installation for MCC Go to Installation for SCC



Tape Drive: Power Down the SPE [R9r]

Return to Task List


Caution! Do not power down the whole cabinet; it is not necessary.


Note: If there are two power supplies, power down the SPE by removing the power plug on the right side of the carrier then by removing the power plug on the left side of the carrier. If there is only one power supply, remove the one power plug on the right side.

For standard reliability, power down the SPE. This causes a service interruption.

For high or critical reliability, power down the standby SPE.

Return to Task List


DEFINITY Made Easy Home Page Table of contents Previous page Next page Index Links Frequently asked questions
Go to Upgrades for R9 Go to Installation for MCC Go to Installation for SCC
Copyright 2000 Avaya Inc
Send comments to MadeEasy Development Team



Always check at the Made Easy Web site for the most current information.