![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
Made Easy Tool for DEFINITY Media Server Configurations
Issue 5, October 2002
Install and Connect SCC1 (Single-Carrier Cabinets)
Install and Connect SCC1
(Single-Carrier Cabinets)
This section describes how to install the Single-Carrier Cabinets (SCC1). For information on Multicarrier Cabinets (MCC1), go to Install and Connect Multi-Carrier Cabinets.
Floor plans and equipment layouts for typical system installations are provided in System Description.
For duplicated systems only: Install Fiber Optic Cable Pass-Thru Kit for SCC1 (Single-Carrier) Cabinets includes instructions for installing the fiber optic cable between the duplication interface circuit packs in cabinets A and B.
Task List: Install and Connect Single-Carrier Cabinets (SCC1)
Perform these tasks before you begin the installation:
- Check Customer's Order
- Unpack and Inspect Cabinets
- If you cannot get timing from the service provider, you may need to install a Stratum 3 clock. If this system includes a Stratum 3 clock, go to Installing the Stratum 3 Clock for instructions.
- Check Circuit Packs
- Correct Shipping Errors
Perform these steps to install the cabinets:
- Position the Cabinets (Standard Reliability) or Position Cabinets (High or Critical Reliability)
- If required, Install Earthquake Protection for SCC1