High or Critical Reliability PPN - Two Cabinet Stack
Return to Task List
- Remove the Time Division Multiplexing (TDM) Bus Terminator from Slot 18 of Control Cabinet A (Processor Port Network (PPN)) and move it to Slot 18 of Control Cabinet B. See Connections for High or Critical Reliability Systems.
- Connect the supplied Time Division Multiplexing (TDM) Bus Cables (WP-91716 L3) from Cabinet A to Cabinet B as shown.
Connections for High or Critical Reliability Systems
Figure Notes:
- AHF110 TDM Bus Terminator (Slot 17)
- TDM/Local Area Network (TDM/LAN) Pinfield (Slot 00)
- TDM bus Cable (WP-91716 L3)
- Port Cabinet
- Control Cabinet A Position
- AHF110 TDM Bus Terminator (Slot 01)
- Slot 18
- Inter-Cabinet Cables (ICC) A, B and C (H600-248-G1)
- Inter-Cabinet Cable (ICC) A
- Inter-Cabinet Cable (ICC) B
- Duplicated Control Cabinet B Position
Return to Task List