Position the Cabinets (Standard Reliability) 

Return to Task List


Caution! Lifting the cabinet may require 2 people, as it may weigh as much as 130 pounds (60 kilograms). Use caution to avoid injury.

Before beginning the cabinet installation, check the location of the AC/DC power receptacles. The receptacles must be on separately fused circuits not controlled by wall switches. They must be located within 10 feet (3 meters) of the cabinet, and outside the Main Distribution Frame (MDF) area.

Refer to the serial numbers and lettered designation strips in the Customer Service Document (CSD) when stacking the cabinets. If earthquake protection is required, skip to Install Earthquake Protection for SCC. Return to this section when finished.

Perform this step first for all standard reliability cabinet installations.

  1. Install the cabinet stack (processor port network)

  2. If additional cabinet stacks are being installed, install the second cabinet stack (EPN)

  3. If three cabinet stacks are being installed, install the third cabinet stack (EPN).

Return to Task List


DEFINITY Made Easy Home Page Table of contents Previous page Next page Index Links Frequently asked questions
Go to Upgrades for si Go to Installation for MCC Go to Installation for SCC
Copyright 2001 Avaya Inc.
Send comments to MadeEasy Development Team



Always check at the Made Easy Web site for the most current information.