DEFINITY Made Easy Home Page Table of contents Previous page Next page Index Links Frequently asked questions
Go to Upgrades for R9 Go to Installation for MCC Go to Installation for SCC



Upgrade other carrier [R9si]

Return to Task List

  1. Lock the SPE switches on the DUPINTs to the other SPE.

  2. The SPE reboots.


Note: Make sure the active tone clock is in the active SPE before continuing.

  1. Log in as craft.

  2. Set the time.

  3. Repeat the Remove translation card, TN790/B, TN778, TN777B or TN794 or TN794/TN2400 circuit packs [R9si] through Power up and set date, time, and daylight savings rule [R9si] on the SPE needing to be upgraded.

Return to Task List


DEFINITY Made Easy Home Page Table of contents Previous page Next page Index Links Frequently asked questions
Go to Upgrades for R9 Go to Installation for MCC Go to Installation for SCC
Copyright 2000 Avaya Inc
Send comments to MadeEasy Development Team



Always check at the Made Easy Web site for the most current information.