![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
DEFINITY Made Easy Tools
Issue 3, December 2001
Install Telecommunications Cabling
Install Telecommunications Cabling
This section provides both information about installing the telecommunications cabling and procedures for doing the installation.
Information about Installing the Cabling
- Provisioning Plan
- Main Distribution Frame (MDF) Hardware
- MDF Cross-Connect Fields
- Main Distribution Frame
- Main Distribution Frame Labels
- Off-Premises Circuit Protection
- Cable Installation
- Sneak Fuse Panels
- Coupled Bonding Conductor
- Installation Space Requirements for the sneak fuse panels, the 110-type hardware, and the Cable Slack Manager
- Station Wiring Design
- Station Circuit Distribution from Equipment Room
- Layout
- Patch Cord/Jumper Installation and Administration
Task List: Installing the Telecommunications Cabling
- Label Control Carrier Cable
- Connect Control Carrier Outputs Cable
- Connect Trunk Pairs Using Concentrator Cables
- Connect Trunk Pairs to Cabinet Using Jumper Wires To Establish 3-Pair Modularity
- Install Cables Between Cabinet and MDF
- Install Connector Cables Between Auxiliary Cabinet and MDF
- Mount 110A- or 110P-type terminal blocks on the wall or Mount 110P-type terminal blocks on a frame
- Install Cable Slack Managers
- Install Sneak Fuse Panels
- Install Coupled Bonding Conductor
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
Copyright� 2001 Avaya Inc. |
Send comments to MadeEasy Development Team |
Always check at the Made Easy Web site for the most current information. |